Facts
The appellant ([A. AG] , based in the Canton of Thurgau) operates a photovoltaic installation, which it commissioned on 13 January 2015. The project had been registered with Swissgrid AG for cost-covering feed-in remuneration (NEO) on 10 November 2011. By decision of 16 November 2011, the installation was classified as in principle eligible for support and placed on the waiting list (waiting list decision). On 25 August 2014, the appellant took over the project from the original registrant.
By ruling of 29 June 2018, the respondent (Pronovo AG, based in the Canton of Aargau, enforcement body under Art. 64 EnA since 1 January 2018) admitted the installation into the feed-in remuneration system and, based on the EnFV of 1 November 2017, set the remuneration rate at 17.4 Rp./kWh. By objection, the appellant demanded a rate of 21.3 Rp./kWh and argued that the old law (aEnA and aEnV of 1998), which had applied at commissioning, was applicable; applying the new law constituted impermissible retroactivity. The objection was dismissed by decision of 8 November 2018. The Federal Administrative Court, Division I, dismissed the appeal by judgment of 26 August 2019 (A-7036/2018).
Before the Federal Supreme Court, the appellant requested that the judgment of the lower court be set aside and the remuneration rate be fixed at 21.3 Rp./kWh pursuant to Annex 2.1 aEnV, or alternatively that the matter be remanded. The lower court and the DETEC waived submission of a response. The respondent submitted observations, and the appellant replied.
Issue in dispute: Whether the application of the new Energy Act (Art. 72 para. 3 EnA) to an installation commissioned before its entry into force, with a waiting list decision, is impermissibly retroactive, whether the waiting list decision establishes protection of legitimate expectations, and whether the remuneration rate violates Art. 22 para. 1 EnA.
Considerations
Admissibility and scope of review: The appeal in public law matters was filed within the time limit and in the required form (Art. 100 para. 1, Art. 42 FSCA), is directed against a decision of the Federal Administrative Court that concludes the proceedings (Art. 86 para. 1 lit. a, Art. 90 FSCA), and is admissible; no exclusion ground under Art. 83 FSCA applies. The appellant has standing to appeal (Art. 89 para. 1 FSCA). The Federal Supreme Court applies the law of its own motion but in principle only examines the complaints raised (Art. 106 para. 1 FSCA; Art. 42 para. 2 FSCA). Complaints of violation of fundamental rights are subject to the qualified duty to raise and substantiate complaints under Art. 106 para. 2 FSCA.
Right to be heard (Art. 29 para. 2 Cst.): The complaint that the lower court failed to address the appellant's calculation and its consequences, as well as the complaint of arbitrariness and discrimination against the transitional provision, is unfounded. The lower court was not required to address the calculation, having considered the remuneration rate of 17.4 Rp./kWh to be lawful as it exceeded 80% of the earlier cost-covering rate of 21.3 Rp./kWh. The arbitrariness complaint was implicitly addressed, as the lower court considered the transitional provision to be objectively justified. Whether this view is correct is a question of law and is not to be examined from the perspective of the right to be heard.
Retroactivity: Genuine retroactivity is constitutionally permissible only if it is provided for or clearly derivable from law, temporally limited, objectively justified, not associated with unjust inequalities, and respects acquired rights. Non-genuine retroactivity is permissible unless acquired rights stand in the way (Art. 190 Cst. must be observed). The Federal Supreme Court notes that Art. 72 para. 3 EnA regulates precisely the present facts: for operators with a mere waiting list decision, the new law applies even if the installation is already in operation at entry into force. The legislature intended that these operators bear the stricter requirements of the new law. As the provision leaves no room for interpretation, it must be applied. Whether genuine or non-genuine retroactivity exists may be left open, since applying Art. 72 para. 3 EnA is in any event not precluded by a prohibition of retroactivity.
Protection of legitimate expectations (Art. 9 Cst.): The waiting list decision of 16 November 2011 is in principle not…