Facts

Plot No. 2515 in the land register of the municipality of Saint-Maurice, with an area of 950 m², belongs to [A.] and supports a residential house in its eastern part.

On 22 June 1998, the Federal Department of the Environment, Transport, Energy and Communications granted the company EOS, later renamed Alpiq and subsequently taken over by Swissgrid SA (the expropriating party), the right of expropriation over this plot for the establishment, to the west, of an easement for the passage of conductors limited to fifty years, intended for the 380/132 kV overhead line Saint-Triphon/Chamoson replacing an existing 220 kV line. The Federal Supreme Court essentially confirmed this decision on 9 November 1999, fixing the clearance distance at 23 m and dismissing the claims for relocation of the line and the complaints concerning the emission limit values (electromagnetic field and noise). Early possession was granted with effect from 30 July 1998.

By decision of 27 February 2002, the Federal Estimation Commission of the 3rd district (the Commission) dismissed the application for total expropriation and fixed the compensation at CHF 14,750. The Federal Supreme Court annulled this decision on 22 July 2003, requiring the use of the difference method. Following an appeal for denial of justice upheld on 28 June 2006, the Commission fixed the compensation at CHF 85,757.50. The Federal Administrative Court (FAC) annulled this decision on 6 December 2010 and remitted the case for a supplementary expert assessment taking into account the value before the easement and the value after replacement of the line, the limit values of the NIRO and the NAO being complied with. The appeal against this judgment was declared inadmissible on 27 January 2011.

By decision of 19 June 2015, the Commission fixed the compensation at CHF 54,000, based on an expert report of 17 November 2012 finding a value for the property of CHF 360,000 (excluding the installation), with a 10% reduction for the old line and 25% for the new one.

Seized of appeals by the expropriated owners and by Swissgrid SA, the FAC allowed the appeal of the expropriated owners and fixed the compensation at CHF 144,000 plus interest. It upheld the combined valuation method, as well as the early possession date adopted. It took into account the relocation of the line by two metres towards the house, its greater significance (two conductors per phase, plus two SBB line loops), the 50% increase in voltage and the noise. It held unjustified the reduction of the 50% depreciation to 25% made by the expert to account for the rise in the property market, a 50% depreciation implying a residual value of CHF 180,000, that is CHF 144,000 in compensation.

Swissgrid SA lodges an appeal in public law matters and requests that the compensation be fixed at CHF 508.90, or alternatively that the case be remitted to the Commission. The FAC and the Commission waived the right to respond. [A.] , as well as his parents in their capacity as usufructuaries, request dismissal of the appeal. The appellant further contests the factual allegations of the respondent in its last submissions.

Considerations

The appeal is admissible under Art. 82 let. a, 100 para. 1 and 86 para. 1 let. a FSCA as well as Art. 87 para. 1 ComPurA; the appellant has standing under Art. 78 para. 1 ComPurA and Art. 89 para. 1 FSCA. However, the respondent's counsel cannot act on behalf of the respondent's parents, who were no longer parties to the proceedings when the contested judgment was rendered.

As to the complaint of incorrect establishment of the facts (residual danger zone from torrents, absence of an enhancing function of the strip overflown), the Federal Supreme Court recalls that the findings of the lower authority bind the Federal Supreme Court save for violation of law (Art. 95 FSCA) or arbitrariness (Art. 97 para. 1 FSCA), and that appellate-type criticisms are inadmissible (Art. 106 para. 2 FSCA). The documents show that the plot lies within a residual torrent danger zone without this affecting its buildability or its classification in residential zone R 2. The 1995 development plan already imposed a building prohibition over 14.5 m from the axis of the installation, and the expert assessment finds a very low degree of utilisation with no additional building possibilities. The complaint is dismissed.

As to the calculation method, the appellant invokes Art. 19 let. b ComPurA to claim a two-step reasoning and compensation according to the standard of the Swiss Farmers' Union. The complaint is inadmissible insofar as it calls the method into question: the judgment of 22 July 2003 already imposed the difference method (value of the land with and without the easement), a question definitively settled before the FAC's remittal decision, so that the appellant cannot revisit it by invoking Art. 19 and 22 ComPurA.

As to the depreciation of the remaining part, the appellant contests the aggravation linked to the increase in voltage, the unassessed noise and the psychological effect. The Federal Supreme Court notes that the leading judgment of 2003 already accepted that a high-voltage line entails a drop in prices, even without restriction of building possibilities, owing to the impact on the landscape and to psychological reasons. The burden of the new installation is greater: the nearest conductor is 12.8 m horizontally from the house, a clearance of 23 m, a line 4.4 m higher, a voltage of 380 kV instead of 220 kV, doubled conductors and additional SBB loops, crackling. The noise was the subject of an impact report which notes an exceedance of the nighttime planning values by…