Facts

Plot No. 15033 of the cadastre of the Commune of Oron, located in the territory of the former Commune of Vuibroye, is owned by [B.] (respondent, represented by a lawyer). It is classified as a village zone under the zoning plan of Vuibroye and is governed by the communal regulation on constructions and spatial planning (RCAT), approved on 14 May 1982. With a surface area of 5'775 m2, it comprises a residential building (127 m2 footprint), an agricultural building (336 m2) and a granary; the residential building and the granary are listed in the LPNMS inventory and received a grade of 2 in the architectural survey.

At its north-western end, the plot adjoins plot No. 15032, owned by [A.] (appellant, represented by a lawyer), which contains a residential building and which he acquired on 11 August 2016 following an inheritance partition.

On 15 March 2016, the respondent applied for a building permit for a residential building with three dwellings in the north-western part of plot No. 15033, with two covered car ports, four outdoor parking spaces and a private access road. The initial project included a dormer window in the east roof slope and, on the south gable façade, two terrace balconies projecting 3 m in depth. The project was subject to public notice from 9 April to 8 May 2016. The appellant objected, as did Romande Energie SA, on the ground that the car ports were planned within a non-buildable corridor associated with a high-voltage line. The covered spaces were replaced by six outdoor spaces, with new plans dated 19 July 2016.

By decision of 17 August 2016, the Municipality of Oron dismissed the objection and granted the building permit. The appellant appealed to the Cantonal Court of the Canton of Vaud, Administrative and Public Law Division, on 8 September 2016. On 10 November 2016, the municipality published a notice concerning the creation of reserve zones in view of the revision of the general zoning plan, the commune being oversized in building zones; the reserve zone covers all building zones, except the regional centres of Oron-la-Ville and Palézieux-Gare and the industrial zone. A hearing and a local inspection took place on 5 December 2016. On 8 January 2017, the respondent produced new plans: removal of the dormer window, balconies reduced from 3 m to 2.30 m, determined façade colour and an outdoor development plan with a hedge.

By judgment of 20 March 2017, the Cantonal Court partially upheld the appeal: the permit is granted, the amendments to the plans of 8 January 2017 being made mandatory and prevailing over the plans submitted for public notice. For the remainder, the communal decision was confirmed. The cantonal court held that nothing indicated that the plot would be affected by future measures reducing the building zone, and that the amended project complied with the communal regulations and the aesthetic clause. The appellant, who largely failed, was ordered to pay court costs and slightly reduced costs (CHF 2'500 and CHF 2'000).

Before the Federal Supreme Court, the appellant principally requests the refusal of the building permit for three apartments, in the alternative the annulment and remittal; he requests suspensive effect (granted by order of 23 May 2017) and the stay of proceedings pending an appeal against two other projects of the respondent (rejected on 11 January 2018). The cantonal court concludes to dismissal, the municipality maintains its position, and the respondent did not submit observations. On 7 February 2018, the appellant produced the public notice of the reserve zone, the related plan and the report within the meaning of art. 47 SPO; the respondent objected to these exhibits.

Main question: does the disputed building permit violate the right to be heard, the SPA (incidental review of the zoning plan, art. 21 para. 2 SPA, anticipatory effect of the reserve zone), the RCAT (boundary distances for balconies) and the rules on costs and fees?

Considerations

Admissibility. The public law appeal is open against a final decision of last cantonal instance in the field of public construction law. The appellant, a direct neighbour who contests the project's compliance with the SPA and the RCAT, has a personal and legitimate interest (art. 89 para. 1 FSCA). The appeal is admissible.

Right to be heard (art. 29 para. 2 Cst.). The appellant complained that the cantonal court refused the production of permits issued since 1 January 2015 and of the correspondence with the SDT. The right to be heard does not preclude anticipatory assessment of evidence, unless that assessment is arbitrary; the appellant is subject to the heightened requirement of substantiation under art. 106 para. 2 FSCA. The appellant does not establish that the growth rate for 2036 has been exceeded: he provides no tangible evidence, and the permits mentioned concern regional centres subject to a different quota. Any exceedance would only be relevant if permits had been issued in disregard of the densification measures of art. 15 SPA and of the cantonal master plan, which the appellant does not argue. The correspondence with the SDT is without relevance, the oversizing of the building zone being established. The complaint is unfounded.

Incidental review and revision of the plan (art. 15 and 21 para. 2 SPA; art. 77 LATC). Incidental review of a zoning plan in an application procedure is in principle excluded, unless the conditions for a re-examination within the meaning of art. 21 para. 2 SPA are met. This examination proceeds in two stages: first, a significant change of circumstances; then, the necessity of adapting the plan after weighing the interests involved. Reducing oversized zones serves an important public interest, but the SPA amendment of 15 June 2012 is not sufficient on its own: it does not prohibit the implementation of existing planning instruments that comply with the SPA and leaves local authorities a wide margin of appreciation in choosing the parcels to be rezoned. Other circumstances must be added, such as the location of the parcel relative to the building zone, its level of infrastructure and the date of entry into force of the plan. In this case, the parcel is situated in an already built-up environment, on a built strip of land along the Route de Lausanne, approximately 500 m from the village bus stop, and adjoins the appellant's own built land. Nothing indicates that the parcel will be rezoned. The reserve zone subject to public notice encompasses many already built parcels, and its art. 6 para. 2 provides for the continuation of permit procedures initiated before 10 November 2016, which is the case of the application of 15 March 2016. The refusal to apply the anticipatory effect of art. 77 para. 1 LATC is therefore not arbitrary, since the commune had limited itself to announcing its intention, without preliminary studies, which is a condition for the application of that provision. The complaint is unfounded.

Boundary distances for balconies (art. 4.2 and 4.5 RCAT). Review is limited to arbitrariness (ATF 141 I 172). Art. 4.2 RCAT imposes a minimum distance of 6 m from the boundary in a village…