Facts

The complainant 1 ([A.]) operates three photovoltaic installations with 182 kWp and 47 kWp in U. and 130 kWp in V. The grid operator at these locations is [C. AG], which is responsible as the distribution grid operator within the meaning of Art. 5 ESA.

On 6 June 2014, complainant 2 ([B.]), on behalf of [A.], asked [C. AG], based on Art. 8 para. 2 ESO, to disclose the measuring points, to provide information about the charges for metering operation with remote reading by an alternative service provider, and to state the possible date for changing the metering service provider. [C. AG] refused on 6 June 2014 and 24 June 2014. It justified this by stating that responsibility for making metering data available and for selecting the metering devices under the Metering Code Schweiz lies with the grid operator. Consent to the performance of parts of the metering services by third parties was expressly not granted.

On 1 July 2014, [B.] applied before the Federal Electricity Commission (ElCom) for an order that [C. AG] consent to the change of metering service provider for remote meter reading and, where applicable, to metering operation. Later, [A.] continued the proceedings alone. ElCom dismissed the application by decision of 15 October 2015 and imposed the fee of CHF 23'600.- as CHF 21'240.- on [A.] and CHF 2'360.- on B.

By judgment of 8 November 2016, the Federal Administrative Court halved the costs imposed on the complainants and otherwise dismissed the appeal. [A.] and [B.] filed a public law appeal against this with the Federal Supreme Court. [A.] requested that [C. AG] be ordered to consent to the change of metering service provider, and in the alternative that the matter be remitted. [B.] challenged only the costs issue. [C. AG] requested dismissal. The Federal Administrative Court and ElCom waived their responses; the DETEC commented without making a request.

The question in dispute was whether the electricity producer must necessarily obtain the metering services from the distribution grid operator or may engage another service provider. ElCom had rejected a monopoly but attributed the metering area to grid operation and rejected a duty to contract. The lower court expressly left open whether the metering services belong to grid operation and dismissed the appeal on other grounds.

Considerations

The complainant 1 operates photovoltaic installations and is therefore an electricity producer. As the competent distribution grid operator, [C. AG] is obliged under Art. 5 para. 2 ESA to connect him to the electricity grid. The only point in dispute is whether he must necessarily obtain the metering services from the grid operator or may engage a third party.

The choice of contractual partner belongs to contractual freedom and is protected by economic freedom (Art. 27 Cst.). A restriction requires a constitutional and statutory basis (Art. 36 paras. 1 and Art. 94 para. 4 Cst.); the grant of a legal monopoly is a serious interference and requires a basis in a formal statute. If the scope of protection is affected, the question is therefore not whether a basis exists for liberalisation, but whether a statutory basis for the restriction is present.

Under Art. 91 para. 1 Cst., the Confederation may monopolise the supply of electrical energy, but has not made comprehensive use of this power. The production, purchase and sale of electricity are in principle subject to the private sector (Art. 4 para. 2 EnA). Because of the factual monopoly of the transmission network, the law provides for an exclusive right of the distribution grid operator for grid operation in its area (Art. 5 para. 1 ESA), obliges it to connect producers (Art. 5 para. 2 ESA) and to provide non-discriminatory network access (Art. 13 para. 1 ESA). Overall, there is therefore an exclusive right for grid operation and otherwise economic freedom. An express legal monopoly for metering does not exist.

The decisive question is therefore whether the disputed metering services belong to grid operation. If they do, they are reserved to the distribution grid operator. If they do not, the choice of metering service provider is subject to the economic freedom of the producer, and the restriction would require a statutory basis. The lower court could therefore not leave this question open, as it goes to the core of the dispute.

The argument that a claim to engage a third party amounts to a duty to contract is only partly convincing. The grid operator is statutorily obliged to connect and to grant network access (Art. 5…