Facts
On 4 May 2012, the commune of Sierre put to public consultation two road redevelopment projects for the city centre entitled 'maille 4', the fourth stage of the Master Plan for the Development and Urban Planning of the city centre (PDAU), adopted by the General Council in April 2006. The first sector concerns Rue Rilke (one-way street reversed in the direction of Avenue des Alpes and Avenue du Rothorn, obligation to turn right); the second concerns Avenue des Alpes (two-way) and Rue Pradec (two-way). The sector is placed in a 30 km/h zone.
The project provoked opposition from neighbouring property owners (nine opponents, including several natural persons and the company [H. SA] ). At the request of the Cantonal Department for Environmental Protection (SPE), a road noise abatement project was put to public consultation on 13 June 2014, providing for a 30 km/h zone, low-noise paving and an application for an exemption for two buildings on Avenue du Rothorn where the immission limit values (VLI) were still exceeded. Three objections were lodged.
By decision of 7 October 2015, the Council of State of the canton of Valais dismissed the objections, approved the road plans subject to conditions and requirements, declared the works to be in the public interest, reserved the signage procedure and granted the exemption.
By judgment of 2 June 2017, the Public Law Division of the Valais Cantonal Court dismissed the appeals of the opponents. It held that the PDAU, provided for in Art. 33 of the Communal Regulation on Construction and Zones (RCCZ), is a planning and information instrument without binding effects, not requiring any particular adoption procedure; that implementation in stages did not violate the principle of coordination; that the noise abatement horizon set at 2018 complied with federal law, 2018 being the most critical period in terms of immissions; that the VLI were respected outside the two sections of Avenue du Rothorn benefiting from an exemption; that the StL-86+ model was prudent; that there was a NAO measures plan and that the increase in emissions would be very slight; and that the 30 km/h zone expert report was sufficient, the engineering office being able to prepare both the plan and the expert report.
The appellants ([A.] et al.) ask the Federal Supreme Court to annul the cantonal judgment and the approval and exemption decisions; in the alternative, to remit the matter to the commune for public consultation and subsequent approval of the PDAU. Suspensive effect was granted on 28 August 2017. The cantonal court and the Council of State waived their observations; the commune of Sierre requests dismissal; the Federal Office for the Environment (FOEN) considers the judgment compliant with federal environmental protection law. The appellants produced a new exhibit (letter of 19 December 2017), the admissibility of which is disputed.
Main question: admissibility of the appeal against a communal master plan and against a decision approving road plans, then merits of the complaints relating to legality, coordination, noise protection, air protection and the ordinance on 30 km/h zones.
Considerations
On admissibility, the appeal in public law matters (Art. 82 et seq. FSCA) is in principle open against the approval decision and the judgment confirming the exemption. The appellants, owners of buildings within the perimeter, have standing under Art. 89 para. 1 FSCA. However, the appeal is inadmissible insofar as it targets the PDAU, as private parties cannot appeal against a master plan (ATF 137 II 254 consid. 3.3; ATF 119 Ia 285 consid. 3b). The letter of 19 December 2017, produced in the reply, is a new fact that is inadmissible under Art. 99 para. 1 FSCA.
On the principle of legality (Art. 5 para. 1 and Art. 49 para. 1 Cst.), cantonal master plans bind only the authorities (Art. 9 para. 1 SPA) and are not enforceable against private parties. Cantonal law (Art. 20 LcAT) does not expressly provide for communal master plans, but communes have wide powers (Art. 6 LCom, Art. 11-14 LcAT) and may adopt sectoral master planning instruments. Under Art. 33 RCCZ, the PDAU is a mere expression of intent, without any communal obligation or restriction on owners; it could therefore be adopted without a specific cantonal legal basis or particular procedure. The numerous amendments it underwent do not call its validity into question, especially for an instrument lacking binding force.
On coordination (Art. 25a SPA, Art. 39 LR), the authority must ensure simultaneous public consultation, material consistency and the absence of contradictory decisions; coordination must be ensured at the authorisation and zoning plan stage. The scope of review depends on the degree of precision of the plan (ATF 123 II 88 consid. 2a and 2d; ATF 129 II 276 consid. 3.4). The two sectors of maille 4 were put to public consultation simultaneously and were the subject of a single decision of the Council of State; the noise abatement project, filed later at the initiative of the SPE, was assessed together with them. The planning authority may freely define the perimeter, provided it forms a coherent whole; the mailles correspond to distinct stages intended for successive implementation. The complaint is dismissed.
On noise protection (Art. 16 EPA, Art. 8, 13 and 38 NAO), an installation that does not comply with the VLI must be remediated. There is no significant alteration (Art. 8 para. 2 NAO): the project aims at a reduction of traffic and a simple redistribution of circulation, without creating new routes; the choice of remediation was therefore correctly made, as FOEN held. The 2018 remediation horizon corresponds to the period…