Facts

The building applicants, [D. AG] and [C. AG] , form the consortium [B.] and are co-owners of the parcels KTN 3401 and 3405 in the municipality of Arth SZ. The building plots lie for the most part in the W2 residential zone and to a small extent in the W2a residential zone. The neighbour (appellant) owns a plot to the south, which is separated by the eastern secondary branch of the Tafelstattstrasse.

On 3 November 2015 the building applicants applied for a permit for four semi-detached houses with eight residential units and double garages. The neighbour lodged an objection. On 11 April 2016 the Arth Municipal Council granted the permit subject to conditions and dismissed the objection. The Government Council of the Canton of Schwyz dismissed the neighbour's appeal on 28 March 2017. The Administrative Court of the Canton of Schwyz, Chamber III, dismissed the administrative law appeal on 27 September 2017 (III 2017 72).

The neighbour filed a public law appeal with the Federal Supreme Court, requesting that the decision of the lower court be set aside and the building permit refused. The lower instances waived a response; the building applicants requested non-admission, or alternatively dismissal.

Subject matter of the dispute includes in particular: (1) the adequate road access to the building project, taking into account plots not yet built on in the Tafelstatt district; (2) compliance with the road regulations of the Municipality of Arth (carriageway and footpath widths, exception for existing roads); (3) the classification of a road as a house access road and whether it may be counted as land area; (4) the gross floor area on parcel KTN 3405.

Considerations

The public law appeal is open against the final cantonal decision on building law (Art. 82 ff. FSCA). The neighbour, as a resident with a specific close relationship and a protectable interest, has standing (Art. 89 para. 1 FSCA). The appeal is admissible. The complaint of violation of federal or international law is admissible (Art. 95 let. a and b FSCA). Cantonal law is reviewed only for arbitrariness (Art. 9 Cst.); arbitrariness exists where the decision is manifestly untenable in its result. Complaints of fundamental rights and constitutional rights must be clearly and specifically substantiated (Art. 106 para. 2 FSCA).

A building permit presupposes the development of the building plot (Art. 22 para. 2 let. b SPA). Adequate access must ensure accessibility for users and for vehicles of public services (Art. 19 para. 1 SPA; Art. 4 HCHOA). The authorities have considerable discretion in their assessment. The decisive factor is the concrete and foreseeable development within the foreseeable future; hypothetical development needs of further parcels are not to be taken into account. The phasing of development (Art. 5 para. 1 HCHOA; Art. 19 para. 2 ParlRA), however, does not release the public authority from its long-term duty of development, so building projects may not be refused by reference to a future inadequate road access as long as the road capacity has not yet been exhausted. The appellant did not identify any concretely planned further building projects in the area, so the lower court did not violate Art. 19 para. 1 and Art. 22 para. 2 let. b SPA when it assumed the present state of development.

The complaint of arbitrary application of § 37 para. 1 PTA was not heard for lack of sufficient substantiation. Under the road regulations (Art. 23 para. 1, Art. 24 para. 1 and Art. 2 para. 2 StrR), existing roads that do not comply with the regulations are permissible as long as they meet the needs. The lower court could non-arbitrarily assume that the main branch of the Tafelstattstrasse meets the needs for the 54 parking spaces, since only the footpath is 0.5 m too narrow and the overall width is only just below the requirements of other municipalities. The eastern branch with fewer than 50 parking spaces is subject to Art. 24 para. 1 StrR; the application of this municipal law is not arbitrary.

House access roads are, under Art. 11 StrR,…