Swisscom (Schweiz) AG planned the construction of a new 18-metre-high antenna mast with GSM and UMTS mobile telephony antennas at Seestrandweg 41 in Erlach (plot No. 1032, building zone). The installation was to stand on the north-western facade of a hall of the boatyard and rise about 13 m above the building. It was to replace a temporary installation that closed a coverage gap after a transmission facility on the post office building had been removed for townscape protection reasons.

Erlach is listed as a small town in the Federal Inventory of Swiss Townscapes of National Importance to be Protected (ISOS). The site lies in surrounding zone XI with conservation objective b. To the north-east is the BLN object No. 1301 'St. Petersinsel-Heideweg'.

In October 2012 Swisscom filed the building application; 56 persons lodged objections. The Regierungsstatthalteramt Seeland granted the permit on 13 August 2013. The Bau-, Verkehrs- und Energiedirektion (ACI) of the Canton of Bern partially upheld the appeal of the 48 objectors on 3 July 2014 and supplemented the permit with two conditions (colour design, protection against emissions); for the remainder it dismissed the appeal. Following an inspection with a delegation of the Federal Commission for Nature and Cultural Heritage (ENHK), the latter issued an expert opinion dated 1 April 2014, which found a slight additional impairment and suggested examining a reduction to 15 m. The Administrative Court of the Canton of Bern dismissed the administrative law appeal by judgment of 16 March 2016.

By way of a public law appeal, 33 appellants (neighbours, represented by an attorney) requested the annulment of the decision, the rejection of the building application, or alternatively remittal for the granting of a permit for an installation reduced to 15 m. The lower court, ACI, the municipality of Erlach and Swisscom requested dismissal. The Federal Office of Culture (BAK) assumed a slight intervention; the Federal Office for the Environment (BAFU) waived a statement.

Considerations

The Federal Supreme Court entered into the appeal, as it concerns a final cantonal decision on a building permit (Art. 82 ff. FSCA) and the neighbours are particularly affected and have standing to appeal (Art. 89 para. 1 FSCA). The complaints must, however, be substantiated under Art. 42 para. 2 FSCA. Blanket repetitions of the cantonal arguments as well as the incidental arbitrariness complaint (Art. 9 Cst.) are insufficient; arbitrariness exists only where a decision is manifestly untenable. Complaints concerning the facts (Art. 97 para. 1 FSCA), such as the assertion that the 18 m height is 'presumably wrong', or the allegedly insufficient examination of alternative sites, fail because the lower court examined several alternatives. The request for a further inspection is rejected, as the file is sufficiently documented.

The complaint of violation of the right to be heard (Art. 29 para. 2 Cst., Art. 6 no. 1 ECHR) on account of the disregard of the physical arguments concerning the 15 m installation is unfounded. The court is not required to address every position of the parties, but only the essential points. The lower court sufficiently considered the ENHK expert opinion and the question of limiting coverage to basic provision.

On the merits, the mobile telephony installation is a federal task (Art. 78 para. 2 Cst., Art. 2 NCHA), so that the NCHA applies directly. An ISOS object deserves undiminished preservation or the greatest possible preservation under Art. 6 para. 1 NCHA; under Art. 6 para. 2 NCHA, for federal tasks, departure from protection is permissible only where opposing interests of equal or higher value of national importance prevail. In the case of a serious intervention, the permit is in principle inadmissible; in the case of a minor disadvantage, a balancing of interests takes place, taking into account replacement measures and the avoidance of negative precedents (BGE 127 II 273).

The ENHK expert opinion carries great weight and may be departed from only for compelling reasons (BGE 136 II 214). The ENHK had only to assess the townscape aspect, not network coverage. Its suggestion to examine the installation at 15 m was not a binding condition.…