Facts

Parties and Proceedings: The appellants are the sole heir of a deceased objector (appellant 1) and a co-owner of a neighbouring property (appellant 2). The respondent plans a two-family house on parcel No. 1764 in Samedan. The Municipality of Samedan is party to the proceedings. The prior instance is the Administrative Court of the Canton of Graubünden, 5th Chamber.

Construction Project and Access: The property is to be accessed from the north via Via Quadrellas, with an entrance to a parking deck with one parking space. From the south, access is planned via parcel No. 507 (and partly No. 1445) from Via Crusch, leading to two parking spaces in an underground garage. Access across parcel No. 507 is secured by an easement (right of way) in favour of the building parcel, the course of which is defined in the site plan of the easement agreement and which permits regular driving with motor vehicles.

Course of Proceedings: The objector and appellant 2 lodged objections against the building application of 29 May 2015. The municipality dismissed the objections on 9 November 2015, insofar as they were admissible, and granted the building application. The Administrative Court dismissed the appeal by judgment of 11 October 2016. The appellants lodged an appeal with the Federal Supreme Court on 12 December 2016, requesting the annulment of the prior instance's judgment and the municipal decision. By presidential order of 19 January 2017, the Federal Supreme Court granted suspensive effect to the appeal.

Appellants' Complaints: The sole complaint concerns the access to the building plot. The path is very narrow (2 m at its narrowest point), has a gradient of up to 19%, is in poor condition and has poor visibility. Expansion would require a building permit, the owners of the encumbered parcel reject the project and would hardly tolerate maintenance work. Art. 12 BG (maximum 12% gradient for open ramps) and the ToySO standards are not complied with. Furthermore, an approximately 100 m long access from the south contradicts the economical use of land.

Arguments of the Prior Instance and the Opposing Parties: The Administrative Court held that maintenance of the existing road is possible on the basis of Art. 737 and 741 CC and does not require measures subject to permit. A judicial inspection revealed that turning and manoeuvring in front of the underground garage entrance are possible. The gradient of 9.3% in front of the double garage is compatible with Art. 12 para. 2 BG; the 12% limit applies only to ramps that lead directly into a road. The ToySO standards are oriented toward traffic safety under Art. 15 BG and are not applicable here. The Administrative Court, the respondent and the municipality request dismissal of the appeal.

Legal Question: Is the building plot adequately accessed via the southern access over the existing path (Art. 22 para. 2 lit. b SPA, Art. 19 para. 1 SPA), and is the prior instance's assessment tenable from the standpoint of arbitrariness?

Considerations

Admissibility and Standard of Review: The appeal is directed against a final cantonal decision in public law matters (Art. 82 lit. a, Art. 86 para. 1 lit. d and Art. 90 FSCA). Appellant 1 is the universal successor of the deceased appellant (Art. 71 FSCA in conjunction with Art. 17 para. 3 FCPA); both are entitled to appeal as co-owners of neighbouring properties (Art. 89 para. 1 FSCA). The appeal is admissible. The appellants complain solely about access; the Federal Supreme Court reviews the application of cantonal law only for arbitrariness, as the cantonal and municipal authorities enjoy considerable discretion in assessing whether access is adequate.

Federal Law Framework for Access: A building permit presupposes that the building plot is accessible (Art. 22 para. 2 lit. b SPA). Access is adequate if it suffices for the intended use (Art. 19 para. 1 SPA, Art. 58 para. 4 CRA). The details follow from cantonal law and cantonal practice, which must be oriented toward the federal framework. Decisive is that users and visitors as well as vehicles of public services can reach the buildings. The drivable road need not extend to the building; sufficient proximity, from which a footpath leads to the building, is enough.

Access via Via Quadrellas: The federal requirements are already met by the northern access via Via Quadrellas with entrance and parking deck. The appellants themselves describe this as sufficient. Their criticism concerns only the southern access to the underground garage, which serves to fulfil the municipal mandatory parking requirements under Art. 9 BG. The Federal Supreme Court examines this question only for arbitrariness.

Gradient, Width and Traffic Safety: Art. 12 BG requires, for open ramps, a maximum gradient of 12% and a forecourt. The provision serves traffic safety and concerns situations in which a steep exit leads directly into a road. This constellation does not exist here, which is why the prior instance did not apply the 12% limit to the entire approximately 100 m long access without falling into arbitrariness. The ToySO standards may not be applied rigidly, as determining the standard of construction is ultimately a matter of…