Facts
Parties and subject matter of the proceedings: Swissgrid AG, as the Swiss transmission system operator (appellant), challenged two judgments of the Federal Administrative Court, Division I, dated 22 March 2016 (A-4025/2015 and A-4043/2015). The respondents are Rheinkraftwerk Säckingen AG and Kraftwerk Ryburg-Schwörstadt AG, as operators of two hydropower plants on the Rhine with rated capacities of 74 MW and 120 MW respectively. Both plants are connected to the Swiss and the German distribution network (network level 3). The lower instance is the Swiss Federal Electricity Commission ElCom.
Facts: On 29 April 2014, ElCom requested Swissgrid to stop granting the capacity priority previously granted to four border power plants from 1 June 2014. On 27 June 2014, the plants applied for the priority under Art. 17 para. 2 ESA to be maintained for supplies to Switzerland and to Germany. After the German transmission system operators terminated the cooperation agreement with effect from 31 December 2014, the parties concluded a new agreement without a priority provision on 11/12 December 2014, effective from 1 January 2015. On 2 March 2015, the plants supplemented their requests with a declaration of the nullity of this agreement, an instruction to conclude a new agreement, and payment of the auction proceeds.
ElCom decisions: By decisions of 19 May 2015, ElCom held that the plants had no priority under Art. 17 para. 2 ESA. It reasoned that there was no cross-border transport over the congested transmission network, since the electricity was fed directly into the respective national distribution network, and that the half-and-half allocation under the concession could be achieved even without the transmission network.
Judgments of the Federal Administrative Court: The Federal Administrative Court upheld the appeals, set aside the decisions and remitted the matter to ElCom. In principle, it affirmed an unconditional priority under Art. 17 para. 2 in conjunction with Art. 13 para. 3 lit. c ESA for the return transport over the transmission network, but required an examination of practical implementation questions, qualifications to avoid undue arbitrage gains, and an examination of a claim for reimbursement. The court declined to hear the request for an instruction to Swissgrid regarding the conduct of negotiations (a supervisory question) and the request for a declaration of nullity of the cooperation agreement (a civil-law contract, not an administrative act). The court costs of CHF 15,000 and a party compensation of CHF 10,000 were imposed on Swissgrid.
Proceedings before the Federal Supreme Court: On 3 May 2016, Swissgrid filed public law appeals (2C_390/2016 and 2C_391/2016), requesting that the lower court judgments be set aside and the ElCom decisions be confirmed. ElCom requested that the appeals be upheld; the plants requested that they be dismissed. The Federal Department of the Environment, Transport, Energy and Communications (DETEC) commented without an express request. The proceedings were joined on 4 April 2017; an instruction hearing took place on 2 May 2017. During the proceedings, the Federal Assembly amended Art. 17 para. 2 ESA on 17 March 2017 and inserted the transitional provision Art. 33b ESA (in force 1 October 2017). Applications submitted under the old law are assessed under the previous law; a priority applies at most until 30 September 2018.
Considerations
Admissibility: The appeals against the remittal decisions are admissible as interlocutory decisions under Art. 93 para. 1 lit. b FSCA, since the ordered clarifications (negotiations with German network operators, determination of the scope of priority, examination of the claim for repayment) entail considerable effort that could be avoided if the appeals were upheld. Swissgrid, as a transmission system operator that could be obliged to grant the priority and to make repayment, has standing to appeal (Art. 89 para. 1 FSCA). In its response, the respondents could raise points on which they had been unsuccessful before the lower court, as there is no incidental appeal in the case of remittal decisions under Art. 93 para. 3 FSCA (BGE 138 V 106).
Subject matter of the dispute: Originally, priority had been requested for the entire production. However, in the proceedings before the lower court, the plants limited their request to the return transport to offset on an ongoing basis the difference between current production and the half-and-half country quota, since production-related asymmetries arise in the feed-in into the distribution networks. The Federal Supreme Court confirms this limitation. The subject matter of the dispute is therefore only the priority for the timely return transport of the share of electricity that exceeds the 50% quota as a result of asymmetric feed-in, and only for the period until 30 September 2018 at the latest under the new law.
Applicable law and interpretation of Art. 17 para. 2 ESA: The applications were filed and assessed under the old law. ElCom and Swissgrid took the view that priority exists only where use of the transmission network is technically and operationally necessary; the plants and the lower court assumed an unconditional priority. The Federal Supreme Court holds that the clear wording of Art. 17 para. 2 ESA does not require that the party entitled to priority be directly connected to the cross-border transmission network or depend on it. All producers and distribution network operators may, by virtue of network access (Art. 13 ESA), use the cross-border network. A technical and operational necessity cannot be derived from the wording; in this respect the Federal Supreme Court follows the lower court and the plants.
No qualification of the priority: The lower court had qualified the priority in order to prevent undue arbitrage gains and not to permit the granting in the most comprehensive possible manner. The Federal Supreme Court considers this view unclear and contradictory: financial support instruments are inherently based on economic advantages for the beneficiaries, so that exploiting the economic advantages of the priority is not abusive but the inherent purpose of the system. Moreover, the lower court had not clearly decided whether the priority was to be granted free of charge or for a fee, and the Federal Administrative Court, as the remitting authority, should have issued binding instructions and answered the essential legal questions (Art. 61 para. 1 APA). The Federal Supreme Court therefore itself clarifies the legal questions.
Methods of interpretation: Systematic interpretation supports a narrow reading, since Art. 17 para. 2 ESA is an exception to the market-based capacity allocation under Art. 17 para. 1 ESA that requires justification; this also corresponds to EU law, the non-discrimination principle and Art. 13 FTA. Historical interpretation, however, shows only that the legislature generally aimed at promoting renewable energy, without regulating the specific scope of the priority. The applications to restrict the priority to exports (return transports excluded) found no reflection in the statutory text. The issue of international treaties (agreement of 1879, treaty of 1929, concessions) led to a proposal in the Council of States, which was based on the statement that border water electricity need not be auctioned; Maissen withdrew his motion. The special position of border power plants was only taken into account in the revised version, not in the previous one; under the old law, the status as a border hydropower plant has no particular significance, since hydropower is already prioritised under Art. 13 para. 3 lit. c ESA.
Practical realities: The limited transmission capacities could, on a literal…