Facts
The applicant, [A. SA] , took part in an open procedure launched by the Comune di [X.] (Ticino) for the award of general contractor works relating to the connection of the [Y.] aqueduct with that of [Z.] . The procedure was governed by the Act on Public Contracts of 20 February 2001 (LCPubb) and its implementing regulation (RLCPubb/ICAPP). The specifications did not provide for particular suitability criteria, and the award was to be made to the best bidder according to weighted criteria (price 50%, reliability of prices 20%, proposed deadlines 12.5%, reliability of the works programme 12.5%, training of apprentices 5%). The special provisions CPN 102 required, among other things, a technical report and a works programme (item 252.120 let. g), specifying that the incomplete or deficient completion of a document would be equivalent to a failure to submit it, with the consequent exclusion of the tender. The call for tenders and the provisions were not challenged.
Four tenders were submitted. On 31 May 2016 the Municipality awarded the contract to the applicant, ranked first with 567.65 points, ahead of the opponent, [B. SA] , ranked second with 558.88 points. The opponent appealed the decision before the Tribunale cantonale amministrativo, which, by judgment of 13 October 2016, upheld the appeal, annulled the resolution and remitted the file to the contracting authority for a new decision, without direct award to the opponent.
The applicant then filed a subsidiary constitutional appeal with the Federal Supreme Court, requesting confirmation of the Municipality's resolution. The cantonal court maintained its position, the opponent requested dismissal of the appeal, and the Comune deferred to the federal judgment. By presidential decree of 15 December 2016, suspensive effect was denied.
The central issue is whether the failure to include in the tender the information on the labour and equipment used in the various phases of the works justified exclusion from the tender or constituted excessive formalism.
Considerations
The Federal Supreme Court first held that, as admitted by the applicant, the conditions of art. 83 let. f no. 2 FSCA were not met, so only the subsidiary constitutional appeal (art. 113 FSCA) was admissible. The remittal judgment is nonetheless final, since it leaves the contracting authority no margin of assessment (arts. 90 and 117 FSCA), and it was issued by a cantonal authority of last instance (art. 86 para. 1 let. d and para. 2 FSCA). The applicant, already the awardee, has a legally protected interest in contesting the annulment of the resolution; the appeal is therefore in principle admissible. The question of the admissibility of the conclusion, raised by the opponent, was left open.
The subsidiary appeal may only complain of the violation of constitutional rights (art. 116 FSCA), and arbitrariness must be substantiated in a qualified manner, explaining that the decision is manifestly untenable both in its reasoning and in its result (BGE 138 I 49; 137 I 1; 136 I 316; 134 II 124). The facts established by the lower authority bind the Federal Supreme Court unless their establishment is arbitrary (art. 105 para. 1 and 118 para. 1 FSCA). In the present case the challenge meets the requirements of substantiation only in part.
As to the merits, the cantonal court found that, while leaving wide freedom as to form, the call for tenders required the works programme to indicate the labour and equipment used in the various phases, so as to allow assessment of its reliability. The applicant had submitted a Gantt chart lacking such information. The applicant argued arbitrary establishment of facts, maintaining that reliability should be assessed solely on the basis of the mathematical formula of the criteria. The Federal Supreme Court rejected this complaint: the finding rested on the textual reading of the call for tenders (item 252.120 let. g and item 624.100 CPN 102), and the applicant did not dispute that it had failed to provide the information, limiting itself to an appellate-style criticism not compliant with art. 106 para. 2 FSCA.
In law, the general principle requires tenders to be complete and compliant with the call for tenders at the time of opening; subsequent correction is in principle prohibited in order to…