Facts

Swisscom (Schweiz) AG applied on 12 April 2013 for a permit for a mobile telephone installation with equipment container on the property Rudolfstrasse 3 in Basel. The Building and Hospitality Inspectorate of the Canton of Basel-Stadt (BGI) dismissed the objections by decision of 11 November 2013 and granted the permit. The Building Appeals Commission of the Canton of Basel-Stadt dismissed the appeal on 27 August 2014, insofar as it was admissible.

The objectors A., B. and C. lodged an appeal with the Appellate Court of the Canton of Basel-Stadt as administrative court. On 7 September 2016 this court carried out an inspection and a hearing and dismissed the appeal.

By public law appeal of 7 December 2016 the appellants requested the annulment of the judgment and refusal of the permit, alternatively remittal. They complained in particular of a violation of the right to be heard (Art. 29 para. 2 Cst.) due to the lack of engagement with the health hazard from radiation, of radiation hazardous to health despite regulatory law, and of an installation concept in the NIRO contrary to federal law, since a nearby antenna on Austrasse had not been taken into account. Swisscom and the Appellate Court requested dismissal; the FOEN considered the lower court's decision to be in conformity with federal law. The BGI did not comment. On 17 January 2017 the President of the I. Public Law Division dismissed the request for suspensive effect.

The questions to be decided were whether the contested decision violated the right to be heard, whether the regulatory law (NIRO) is inadequate for health purposes or contrary to federal law, and whether the Austrasse antenna had to be taken into account in determining the relevant installation.

Considerations

The Federal Supreme Court has jurisdiction, as this is an appealable final decision of a cantonal court of last instance in the area of spatial planning, construction and environmental protection law (Art. 82 let. a, Art. 86 para. 1 let. d, Art. 90 FSCA). The appellants are legitimised as neighbours and parties to the proceedings (Art. 89 para. 1 FSCA). Only federal law may be complained of (Art. 95 let. a FSCA); the Federal Supreme Court is bound by the facts established by the lower court unless they are manifestly incorrect (Art. 105 FSCA).

As to form, the appellants complain of insufficient reasoning and violation of the right to be heard (Art. 29 para. 2 Cst.). The court leaves open whether the appeal meets the requirements of reasoning. The authority need not expressly refute every assertion, but must only state the decisive considerations. The health hazard was examined by the Building Appeals Commission in its interlocutory decision of 24 April 2014 and by the Appellate Court, taking into account an FOEN opinion and an inspection. The complaint is therefore unfounded.

New newspaper articles from December 2016 are inadmissible novae under Art. 99 para. 1 FSCA and are removed from the file. For Federal Council ordinances, the Federal Supreme Court examines whether the Federal Council has kept within the scope of its delegation and whether the regulation rests on serious grounds (Art. 9 Cst.); questions of expediency are beyond the court's review. Under Art. 12 EPA and the NIRO, mobile telephone installations are limited by installation limit values (OMEN) and immission limit values (OKA). The regulatory law in the area of non-ionising radiation is exhaustive, so cantonal law has no room for manoeuvre. According to case law (judgment 1C_340/2013), the limit values are constitutional and lawful according to the current state of knowledge; the Confederation continuously follows scientific developments. The complaint of inadequate regulation is therefore rejected.

The extended installation concept under item 62 Annex 1 NIRO aggregates antenna groups on the same mast or in close spatial connection as one…