Facts

The appellant [A.] , owner of the neighbouring parcels hhh and iii, opposes a project to build two apartments, two duplexes and an underground garage on parcel no. eee in [D.] (VD), owned by [C.] and promised for sale to [B. SA] and [F. SA] . The parcel lies in a village zone within the meaning of the communal regulation on the zoning plan and building police (RPA), in the hamlet of Châtel, which is listed in the Federal Inventory of Landscapes, Sites and Natural Monuments (IFP) and in the Cantonal Inventory of Natural Monuments and Sites (IMNS). A building permit application was filed on 30 April 2010.

By decision of 21 September 2011, the municipality granted the permit and lifted the objection. On appeal, the Administrative and Public Law Chamber of the Vaud Cantonal Court allowed the appeal on 24 January 2013, annulling the municipal decision (in particular the roof lighting openings) as well as the derogation granted by the Forest, Wildlife and Nature Service (SFFN) for the rock retaining wall located less than 10 m from the forest edge.

A second project, modified as to the dormer windows and the distance from the forest, was filed on 10 June 2013. The Centre for Building Permit Authorisations (CAMAC) granted the special authorisations on 2 April 2014. By decision of 16 June 2014, the municipality lifted the objection and granted the permit. Objectors subsequently requested the installation of profile poles, which was carried out on 7 August 2014. The appellant lodged an appeal on 19 August 2014.

By judgment of 11 February 2015, the Cantonal Court dismissed the appeal. It held that the installation of profile poles required neither revocation of the decision nor a new public inquiry, that the Cantonal Insurance Establishment against Fire and Natural Elements (ECA) had imposed sufficient conditions against landslides, and it rejected the complaints concerning the roof, the attic spaces, the landscape and aesthetics.

Before the Federal Supreme Court, the appellant requests that the building permit be refused, or alternatively that the judgment be annulled and the matter remitted. He requests suspensive effect, which was granted by order of 24 April 2015. The Cantonal Court waived its right to respond; the municipality and [B. SA] request dismissal of the appeal; the Federal Office for the Environment (FOEN) considers that the project complies with forestry legislation and may be approved with regard to landscape protection.

Considerations

As to admissibility, an appeal in public law matters is admissible against a final decision rendered in last cantonal instance in the field of public building law (art. 90, 86 para. 1 let. d, 82 let. a FSCA). The appellant, as a directly affected neighbour, has standing under art. 89 para. 1 FSCA.

As to the right to be heard (art. 29 para. 2 Cst.), the refusal of a local inspection does not violate this right. The assessors, appointed for their technical expertise, were again called to sit and were able to rely on their observations from the inspection of 27 June 2012; the project is largely identical to the previous one. The PDL Bugnaux did not change the regime applicable to Châtel, and the installation of profile poles does not bind the cantonal court. The complaint is dismissed.

As to the finding of the forest nature (art. 10 ForA, art. 27 LVLFO), the Federal Supreme Court finds no directives in the judgment of 24 January 2013. Even if a formal finding should have been made, the omission does not justify annulment: the DGE/FO and the FOEN demonstrated that the vegetation in the upper part of the parcel consists of "rejets" or fallow land without forest function, and that it has not reached the minimum age of twenty years (art. 4 LVLFO). The appellant does not genuinely challenge these findings, and he was able to contest the question of the distance from the forest edge before the cantonal authority. The complaint is dismissed.

As to the late installation of profile poles (art. 108 para. 3, 109 and 114 LATC, art. 22 SPA), arbitrariness presupposes a solution that is untenable and in manifest contradiction with the actual situation. Profiling serves a publicity function; unlike in judgments 1C_385/2013 and 1C_387/2013, the appellant here had the information necessary to file an objection within the inquiry period, as he did for both projects. The plans allow the scale of the project to be assessed. The forty-day period of art. 114 para. 1 LATC is directory and does not prohibit profiling after the permit has been issued. The complaint is dismissed.

As to derogations not subject to public inquiry (art. 85a and 109 para. 2 LATC), these requirements are directory and entail nullity only if the omission prevented the party from asserting its rights. The appellant expressed his views on the contested points, and the municipality approved the project; remitting the matter for a new inquiry would be excessively formalistic. The complaint is dismissed.

As to the derogation concerning the lighting of bedroom 1 (art. 6 para. 2 LATC, art. 85 LATC, art. 28 RLATC, art. 77 RPA), art. 28 RLATC expressly provides for the possibility of derogation; it is therefore not arbitrary to allow a derogation on this basis alone. The illuminated surface (20 m2) was correctly…