Facts
[A. AG] submitted a building application for the construction of a new works depot with a concrete plant, workshop, material and sorting halls, operations building and commercial buildings on plots in the industrial and commercial zone in Oberrüti (Canton Aargau). The application was publicly displayed from 11 April to 10 May 2011. The site is bounded on the south side by the Schorenbach, which crosses it over a length of approximately 110 m. The workshop, the sorting halls and the operations building are to maintain a water distance of 6 m, and the planned terrain embankment a distance of 4 m. The stream is partially culverted in the area of the workshop. Various objections were raised.
The Building Permits Division of the Department of Construction, Traffic and Environment (BVU) of the Canton of Aargau granted cantonal approval subject to conditions on 28 November 2011; the Environment Division submitted an opinion on the environmental impact assessment. On 27 November 2012 the Municipal Council of Oberrüti dismissed all objections and granted the building permit subject to conditions and requirements.
The objectors filed an administrative appeal with the Cantonal Government Council, which dismissed it on 17 December 2014. The Administrative Court of the Canton of Aargau, 3rd Chamber, upheld the objectors' appeal by judgment of 8 July 2015 and annulled the decision of the Cantonal Government Council as well as the building permit of the Municipal Council.
By appeal of 11 September 2015, [A. AG] and the building owners B. and C. [A.] applied to the Federal Supreme Court and requested the annulment of the decision of the Administrative Court. The Administrative Court requested dismissal; the respondents likewise requested dismissal, alternatively remittal. The Municipal Council requested that the appeal be upheld and the case remitted to the lower court. The BVU waived its right to comment; the Federal Office for the Environment (BAFU) concluded that the contested decision complied with the federal water protection provisions.
Main points of dispute:
- Admissibility of the appeal in the cantonal proceedings and standing of the objectors (cantonal procedural law, prohibition of denial of justice, right to be heard)
- Applicability of the water area under the transitional provisions of the Water Protection Ordinance (ÜbBst WPO) and primacy of federal law
- Existence of a 'densely built-up area' and thus the possibility of an exceptional permit under Art. 41c para. 1 lit. a WPO
Considerations
The Federal Supreme Court admits the appeal as a public law appeal against a final cantonal decision on a building permit rendered by the last instance (Art. 82 lit. a, Art. 86 para. 1 lit. d, Art. 89 para. 1 FSCA). The appellants, as building owners directly affected, have standing. The purely cassatory request suffices, since the reasoning shows that the matter is to be remitted (Art. 42 para. 1 FSCA; BGE 137 II 313). New facts and evidence (photo documentation, submission of the municipality) are inadmissible under the prohibition on novel submissions (Art. 99 para. 1 FSCA) and because they are untimely.
On the cantonal procedural complaint: a qualified violation of the attorney monopoly under § 14 para. 3 VRPG/AG does not exist, since the objectors had granted the main appellant powers of attorney with a right of substitution, and only the authorised lawyers appeared before the Administrative Court. A withdrawal declaration by individual objectors is not substantiated, since they had co-signed the objection and were not recorded as having withdrawn in the municipal decision. On standing, the Federal Supreme Court notes that Art. 89 para. 1 FSCA requires a specific closeness of relationship, but cantonal law may define the right of appeal more broadly (Art. 111 para. 1 FSCA). A plainly untenable cantonal practice has not been demonstrated. A violation of the prohibition of denial of justice or of the duty to give reasons (Art. 29 para. 2 Cst.) does not exist, since the Administrative Court addressed the question of standing and the objection concerning noise was not raised in the proceedings before the lower court.
On the substantive water protection law: in the absence of a cantonal determination of the water area, the transitional provision of para. 2 lit. a ÜbBst WPO applies, under which a strip of 8 m on each side of the watercourse plus the width of the channel bed may not be occupied by installations (including terrain alterations). The legal situation at the time of the permit after 1 June 2011 is decisive (BGE 139 II 243; BGE 139 II 470). The cantonal water distance rule of 6 m (§ 127 BauG/AG) takes precedence over federal law under Art. 49 para. 1 Cst. and therefore cannot be invoked; the principle of good faith has not been violated.
For an exceptional permit under Art. 41c para. 1 lit. a WPO, the site would have to be regarded as a 'densely built-up area'. The term is to be interpreted uniformly under federal law; the Administrative Court was entitled to review the application of the law by the…