Facts

The appellants, two co-owners (hereditary community) of a plot of land located in the municipality of Puidoux, are burdened by an easement in favour of the municipality of Lausanne, Services industriels de Lausanne (SIL), covering the prohibition on building, the restriction on planting, the passage of a high-voltage power line (2 circuits) and the maintenance of a pylon, as well as a right of access on foot and by vehicle for supervision and maintenance. These entries were recorded in the land register on 15 July 1957.

On 6 December 2013, [C. SA] (the applicant) filed with the Federal Electrical Inspectorate (ESTI) an application for approval of plans to replace, over 9,147 metres, a steel earth wire with an aluminium alloy cable containing optical fibre, and to optimise the phase order of the mixed high-voltage overhead line (2 x 125 kV) Pierre-de-Plan - Puidoux. The optical fibre was to be used by the operator (SIL) for its own network operation. The project was put to public inspection from 11 February to 12 March 2014; no objection or observation was lodged. Several federal and cantonal offices issued favourable opinions.

By letter of 13 March 2014, the appellant [A.] disputed that the installation corresponded to the easement, objecting to any data transmission, whether internal or commercial.

By decision of 16 April 2014, ESTI approved the project subject to conditions, expressly excluding data transmission on behalf of third parties and requiring the prior acquisition of additional easements in case of future use for that purpose. The Federal Administrative Court (TAF) dismissed the appellants' appeal by judgment of 23 January 2015.

Before the Federal Supreme Court, the appellants principally seek a finding that the approval decision is null and void and, in the alternative, its annulment. ESTI and the respondents seek dismissal. By order of 30 March 2015, suspensive effect was granted.

Considerations

The public law appeal is admissible, the decision being final and rendered by the TAF in a public law matter (art. 90, 86 para. 1 let. a and 82 let. a FSCA). The request for production of two ESTI files is inadmissible, for lack of sufficient reasoning as to the TAF's assessment (art. 106 para. 2 FSCA).

On the merits, the appellants, who did not lodge an objection within the public inspection period, argued that the optical fibre constituted a telecommunications installation not covered by the easement, requiring expropriation and personal notice under art. 16e ElecA. The Federal Supreme Court holds that the easement covers the passage of a high-voltage power line; the nature of the fibre is of little importance, only its use counts. As the fibre is intended solely for internal data transmission necessary for the operation of the line, without transmission on behalf of third parties (which the decision excludes), there is no aggravation of the easement. The provisions of the TCA and the OTS do not alter this assessment, the decisive question being whether the transmission serves the purpose of the easement without exceeding it. No personal notice was therefore required, and the TAF rightly denied the appellants standing under art. 48 para. 1 APA, only a possible nullity being capable of examination.

Absolute nullity only affects the most serious defects, which are manifest or easily detectable, and exceptionally so, in particular in cases of grave procedural defects or qualified lack of competence (ATF 138 II 501; 138 III 49; 137 I 273). The complaints directed against the decision are therefore examined only from that angle.

As regards landscape protection, the application form did not mention the inclusion of the line in an IFP site and a protected cantonal zone. This procedural defect is not serious, as the specialised authorities were consulted and had the complete plans, and the appellants do not demonstrate that they were deterred from lodging an objection. The complaint relating to the Lavaux protection plan, a matter of cantonal law, is insufficiently reasoned (art. 106 para. 2 FSCA). As for the impact on the IFP object, it is relativised since the line already exists, its route and pylons remain unchanged and…