Facts

The appellant [A.] applied on 19/20 December 2011 for a permit to demolish an existing house with garage and to build a new single-family house on parcel No. 3089 at Inselweg 43 in Hurden (municipality of Freienbach). The property lies in the rural residential zone L2, borders Lake Zurich (Obersee) to the northeast, and is separated from the Durchstichkanal only by parcel No. 3354.

The respondents [B.] (owner of parcel No. 3191) and [C.] (building-right holder of parcel No. 3354) filed objections. After project amendments, the cantonal Office for Spatial Development granted the cantonal building permit on 4 April 2013 with ancillary provisions and dismissed the objections. The Municipal Council of Freienbach confirmed the building permit on 25 April 2013 and granted exceptional permits for falling short of the waters distance, the boundary distances and the building distances.

The Government Council of the Canton of Schwyz upheld the appeals on 10 February 2015 and annulled the building permits. The Administrative Court of the Canton of Schwyz (Chamber III) dismissed the appeal of the building owner on 16 July 2015. It reasoned that the planned building in the waters area goes beyond a minor extension of the existing building and therefore does not fall under the existing-rights protection of Art. 41c para. 2 WPO. Since there is no densely built-up area, an exceptional permit under Art. 41c para. 1 WPO is also not possible.

By public law appeal and subsidiary constitutional complaint, the building owner requested the annulment of the lower court's decision and confirmation of the building permit, alternatively remittal. The Federal Supreme Court had in particular to decide on the classification of the Durchstichkanal, the transitional regulation of the waters area, the protection of existing rights under cantonal law (§ 72 PTA/SZ), the exceptional permit for densely built-up areas, and the complaint of violation of the right to be heard (inspection on site).

Considerations

The public law appeal is admissible (Art. 82 lit. a, Art. 86 para. 1 lit. d, Art. 89 para. 1 FSCA). Since constitutional complaints may be raised with this appeal (Art. 95 FSCA), there is no room for a subsidiary constitutional complaint (Art. 113 FSCA). The Durchstichkanal is to be classified as a standing body of water, since it is not part of the municipal inventory of waters areas, which is limited to flowing waters, and it fulfils water-ecological functions. The building lies within the transitional waters area of 20 m width and can only be permitted if it enjoys protection of existing rights or an exceptional permit under Art. 41c para. 1 WPO is possible.

The complaint that the waters area must not be designated because parcel No. 3354 is already built up is unfounded. Neither the wording nor the purpose of the ordinance provides for such an exception; a further increase in built-up areas is to be prevented. Existing developments are only to be considered in the exceptional permit under Art. 41c para. 1 WPO, not already when determining the waters area.

As regards the protection of existing rights in the building zone, this is primarily governed by cantonal law, whereby the cantons have a margin of discretion; the guarantee of property (Art. 26 Cst.) must be respected, and the federal regulation must not be undermined. The interpretation of cantonal law is only reviewed for arbitrariness (Art. 9 Cst.). Under § 72 PTA/SZ, the existence of lawfully erected buildings is protected; reconstruction to the former extent is only possible within five years. The Administrative Court non-arbitrarily denied the existing-rights guarantee, since the number of storeys and the floor plan would be substantially changed, the share of the building in the waters area would rise by 36 % (from 58.32 m2 to 79.36 m2), and the total encroachment on the waters area would increase (220.71 m2 compared with 202.53 m2). The objections concerning garden installations and changed housing needs do not alter this.

The complaint of violation of the right to be heard due to the waiver of an inspection on site is unfounded. The garden design was not decisive for the existing-rights protection; comparisons of size and area, which arose from the files, were decisive. The court…