Facts

The respondent (owner of plot No. xxx in the two-storey residential zone W2B of the municipality of Weggis) intended to demolish the existing building and erect two new single-family houses (House A and House B). House A (lower-lying) was to be accessed via the Riedsortstrasse to the south, House B (higher-lying) via the Rigistrasse to the north.

On 18 December 2013 the Weggis Municipal Council granted the building permit subject to conditions and requirements. It included exemptions for a reduced garage forecourt length, a localised deviation from the terrain norm, and a partial shortfall of the ordinary building distance. The Municipal Council dismissed the objection of the appellant, owner of a neighbouring plot, insofar as it entered into the matter.

The Lucerne Cantonal Court, 4th Division, dismissed the appellant's appeal on 5 February 2015. On 13 March 2015 the appellant lodged a public law appeal with the Federal Supreme Court, requesting that the judgment be set aside and the building permit refused, or alternatively that the matter be remitted. The Municipal Council and the respondent requested dismissal; the lower court waived a response.

Subject matter of the dispute: Construction and planning law; development and traffic safety of the access to House B, exemption for the shortened garage forecourt, exemption for the shortfall of the ordinary building distance, zoning conformity and protection of the built environment, and exemption for the deviation from the terrain norm.

Considerations

Admissibility and facts: The Federal Supreme Court entered into the appeal, as it concerns a final cantonal decision on the merits in a public law matter (Art. 82 let. a, Art. 86 para. 1 let. d and para. 2, Art. 90 FSCA), and the appellant has standing as an immediate neighbour (Art. 89 para. 1 FSCA). The lower court's findings of fact (low traffic volume on the Rigistrasse) are not arbitrary; a substantiated complaint was largely absent (Art. 105, 97 para. 1 FSCA). The complaint of insufficient reasoning (Art. 29 para. 2 Cst.) was rejected, as the lower court had addressed the essential submissions. The complaint concerning an overall assessment of the building project was not examined for lack of adequate reasoning.

Development and traffic safety (Art. 19, 22 SPA; § 119 PTA): A plot is considered developed where adequate access exists; the use and local circumstances are decisive, and the cantonal authorities enjoy considerable discretion in this respect. Access via the lower-classified Rigistrasse is appropriate on a sloping site; the fact that other plots are accessed only via the Riedsortstrasse does not render the access impermissible. The Rigistrasse is a subordinate road, not a main traffic route. The sight distances (more than 20 m, or 22 m at a 3 m observation distance) satisfy the ToySO standards SN 640 050 and SN 640 273a; the standard SN 640 060 (light two-wheeled traffic) is not relevant. A future increase in traffic was not a permissible new submission (Art. 99 para. 1 FSCA).

Shortened garage forecourt (§ 119 paras. 2 and 3 PTA): The lower court was entitled to regard a forecourt length of 5.4 to 5.8 m as exceptionally permissible, since the Rigistrasse has no through traffic and only minor local traffic, the deviation from the minimum length of 6 m is slight, and the condition requiring remote radio opening of the garage doors applies. This is not untenable.

Building distance, zoning conformity and built environment (Art. 22 para. 2 let. a SPA; §§ 131, 133, 140 PTA; Art. 47 BZR Weggis): The two buildings are independent, unconnected structures and may each individually not exceed the permissible…