Facts
[B. AG] operates several collector wells for mineral water production in the municipality of Termen and planned two further collector wells. On 1 February 2019 it submitted a building application for four exploratory boreholes and pumping tests on its own plots in the area 'Unteres z'Matt' in the commercial zone. The application was based on a hydrogeological expert report dated 16 January 2019. The boreholes lie within the Au groundwater protection area and partly within groundwater protection zone S3.
[A. AG] , owner of neighbouring plots with existing collector wells, lodged an objection. The municipality of Termen dismissed it on 28 May 2019 and granted the building permit subject to conditions. The cantonal Environmental Protection Department granted the water protection authorisation with numerous conditions, which became part of the building permit.
[A. AG] lodged an administrative appeal with the Council of State, which dismissed it on 18 December 2019, and subsequently an administrative court appeal with the Cantonal Court of Valais. That court dismissed the appeal on 5 August 2020. [A. AG] then lodged a public law appeal with the Federal Supreme Court, requesting refusal of the building permit or, alternatively, remittal. Suspensive effect was granted. The FOEN concluded that the judgment does not breach federal environmental law.
The following complaints were raised: violation of the right to be heard (Art. 29 para. 2 Cst., Art. 19 VVRG/VS), violation of Art. 10a EPA (EIA), Art. 43 para. 3 GschG (mixing of aquifers), Art. 31 GschV (protective measures), Art. 28 para. 2 BauG/VS and Art. 44 para. 2 BZR Termen, Art. 11 para. 1 EPA, and Art. 6 of the EDI Ordinance on Beverages (mineral water).
Considerations
The contested judgment is a final cantonal decision in a public law matter (Art. 82 lit. a, Art. 86 para. 1 lit. d and para. 2, Art. 90 FSCA). The appellant, as owner of directly neighbouring plots with existing collector wells, has standing under Art. 89 para. 1 FSCA, since it is disputed whether the boreholes may adversely affect its wells. The appeal is therefore admissible insofar as admissible and adequately substantiated complaints are raised (Art. 42 para. 2, Art. 106 para. 2 FSCA). The findings of fact are binding under Art. 105 FSCA unless they are arbitrary (Art. 9 Cst.) or based on a violation of law within the meaning of Art. 95 FSCA (Art. 97 para. 1 FSCA).
On the right to be heard (Art. 29 para. 2 Cst.): an anticipatory assessment of evidence is permissible if further evidence would not change the court's conviction. The facts were sufficiently clarified on the basis of extensive investigations; the production of documents relating to an earlier, abandoned boring was not decisive. The duty to give reasons does not require engagement with every party submission; the lower court has set out the essential considerations. The complaints are dismissed.
On EIA (Art. 10a EPA, item 80.9 Annex EIAO): the EIA requirement applies to groundwater abstraction facilities with an annual abstraction volume of at least 10 million m3. The subject of the proceedings is solely the exploratory boreholes and pumping tests, which do not yet constitute a collector well. An overall assessment of the installation together with future collector wells is not the subject of these proceedings and would have to be examined within the framework of a specific project. The complaint is dismissed.
On Art. 43 para. 3 GschG: the lower court established with binding effect that casing in unconsolidated rock excludes additional groundwater exchange. The appellant's deviating expert report of 23 May 2019 does not render that finding arbitrary; the FOEN also supports the assessment. There is no violation of Art. 43 para. 3 GschG.
On Art. 31 GschV and the groundwater protection…