Facts
Sunrise Communications AG (respondent) filed a building application with the Widen Municipal Council for the construction of a new mobile antenna installation on the flat roof of an existing building on plot No. 146 in Widen. The application was publicly displayed from 15 February to 15 March 2016. The appellant ([A.] ) lodged an objection. The Department of Construction, Transport and Environment (BVU) of the Canton of Aargau approved the project subject to conditions. On 7 June 2016 the Municipal Council granted the building permit subject to conditions and dismissed all objections.
The Government Council of the Canton of Aargau dismissed the appellant's appeal on 23 November 2016. The Administrative Court of the Canton of Aargau, 3rd Chamber, dismissed the appeal by judgment of 5 May 2017.
By appeal in public law matters of 9 June 2017, the appellant requested that the lower court's judgment be set aside, or alternatively that the matter be remitted for supplementation. The respondent requested that the appeal be dismissed. The Administrative Court waived a response. The Federal Office for the Environment (FOEN) considered the contested judgment compliant with federal environmental law.
Subject matter of the dispute and main submissions:
- Installation: base stations of Sunrise, Salt and Swisscom with a total of 18'650 W ERP, nine multi-band antennas (800, 900, 1800, 2100 MHz) at three heights on an approximately 10-metre mast, plus directional radio antennas.
- Harmful health effects of mobile radiation; alleged failure of the federal specialist authorities; refusal of the installation based on cantonal constitutional law.
- Doubts regarding the quality assurance system (QA system) and official supervision, possibility of manipulation of transmission parameters, alleged insufficient clarification of the facts.
- Criticism of the acceptance measurement due to measurement uncertainty (METAS official report of 11 June 2014, uncertainty of 45%).
Considerations
1. Admissibility The contested decision is a final cantonal decision on the merits concerning a building permit for a mobile installation and is subject to appeal in public law matters (Art. 82 ff. FSCA). The appellant lives within the perimeter where radiation still amounts to 10% of the installation limit value and is therefore entitled to appeal (Art. 89 para. 1 FSCA; BGE 128 II 168 consid. 2). In principle, the appeal is admissible.
2. Protection from emissions and exhaustive federal regulation Protection from emissions is governed under federal law by the EPA and the NIRO (Art. 1 para. 2, Art. 11 para. 2, Art. 12 EPA; Art. 1, Art. 4 para. 1 NIRO, No. 6 Annex 1 NIRO). The limit values must be observed at locations of sensitive use (OMEN) as installation limit values and at locations for short-term stays (OKA) as immission limit values (No. 64 and 65 Annex 1 NIRO; Art. 13 para. 1 NIRO). According to case law, the regulatory law in the area of non-ionising radiation is exhaustive, so that no scope remains for municipal and cantonal law (BGE 138 II 173 consid. 5.1). The Federal Supreme Court confirmed the limit values as consistent with the constitution and statute in judgment 1C_576/2016; there is no reason for review. The complaint of a violation of cantonal law (cantonal constitution) therefore fails, especially as the appeal does not specifically dispute that the limit values are arithmetically observed.
3. Quality assurance system and right to be heard The building permit requires implementation of the QA system recommended by the FOEN. The right to be heard (Art. 29 para. 2 Cst.) includes the right to have relevant evidentiary requests admitted; however, the authority may, by anticipatory assessment of evidence, forgo further evidence if it has formed its conviction without arbitrariness (BGE 141 I 60 consid. 3.3). The QA system is considered a permissible alternative to control through structural measures (judgments 1C_286/2014, 1C_122/2014). The AFU report of 15 August 2016 confirms its suitability; according to the FOEN, the cantonal authorities have adequate access to the BAKOM database. The appellant's objections do not give rise to substantial doubts. The possibility of manipulation was already addressed in 1C_169/2013; the suitability of QA systems was generally reviewed (report of 18 January 2012, judgment 1C_661/2012). The inspection of the QA system could therefore be rejected by anticipatory assessment of evidence. The request to obtain the test report of the Canton of Schwyz (deviations in antenna height or…