Facts
[C.] und Co. (respondent) filed a building application on 29 July 2015 for the renovation and extension of the Wiesental shopping centre in Chur. The three-storey building is to comprise existing sales areas for food and a sports specialist store, and newly a DIY store. The environmental impact report is dated 28 July 2015 and was revised on 16 November 2015. The public display ran from 21 August to 10 September 2015.
[A. AG] (neighbour, owner of adjoining plots) and [B. AG] (owner of strata units on an adjoining property) lodged objections on 10 September 2015 and applied for refusal of the building permit.
By decision of 5 July 2016, the Chur City Council dismissed the objections and granted the building permit subject to conditions and requirements. In particular, before construction commenced, the following had to be submitted for approval: project plans for the roofing and enclosure of the loading ramp on the north side (no. 5.1.4) and a revised site plan with detailed information on access and planting (no. 5.3.2).
The appellants applied on 9 September 2016 to the Administrative Court of the Canton of Graubünden, which conducted an inspection in situ on 10 July 2017 and dismissed the appeal by judgment of 12 September 2017. By submission of 8 November 2017, the appellants lodged a public law appeal with the Federal Supreme Court and requested annulment of the administrative court judgment and of the building permit. The President of the First Public Law Division granted the appeal suspensive effect.
The lower court, the City of Chur and the respondent requested dismissal. The Federal Office for the Environment considered the contested judgment compliant with environmental protection law, but pointed out that the building measures associated with the handling of goods were to be approved in a separate procedure.
Subject matter of dispute: Whether the building authority was entitled to remedy the deficient project components (parking spaces, noise, air pollution control, traffic safety, green space ratio) by means of conditions under Art. 90 para. 1 CRA/GR instead of refusing the permit.
Considerations
The public law appeal is in principle admissible against the final cantonal decision in building law (Art. 82 ff. FSCA). The appellants, as neighbours in the building law sense, have standing to appeal (Art. 89 para. 1 FSCA), as they have a practical interest if the construction project could not, or could not be implemented as planned, were the appeal upheld. The complaint of a violation of cantonal law is only admissible as a complaint of arbitrariness under the constitutional prohibition of arbitrariness; arbitrariness exists where the decision is manifestly untenable (Art. 95 lit. a-c FSCA).
The appellants complain of an arbitrary application of Art. 89 para. 1 and Art. 90 para. 1 CRA/GR. Under Art. 89 para. 1 CRA/GR, construction projects may only be approved if all regulations are complied with; under Art. 90 para. 1 CRA/GR (comparable to § 321 para. 1 PTA/ZH), defects may be remedied by ancillary provisions if they can be remedied without particular difficulty or if orders are required to establish the lawful condition.
A partial building permit presupposes that approved and unapproved parts can be clearly separated and that the building owner accepts this (principle of the unity of the building permit decision, coordination principle, principle of disposition). In this case, a partial permit was not at issue and would also not be possible, as the parts cannot be separated.
Ancillary provisions can only remedy minor defects. This possibility lapses where defects require a substantial project change or conceptual revision, or where it cannot be assessed without considerable planning effort how the defects are to be remedied. This follows from the principle of the unity of the building decision and from the federal coordination requirement under Art. 25a SPA, according to which a construction project must be examined in a single, unified procedure. Subsequent procedures are only permissible if…