Facts
The Kraftwerke Oberhasli AG (KWO) operates numerous interconnected hydroelectric power plants in the Oberhasli, including the Grimsel and Räterichsboden storage lakes. The Government Council of the Canton of Bern consolidated the concessions in the overall concession No. 16 G 101 by decision of 12 January 1962.
By decision of 25 February 2004, the Federal Council definitively included the landscape north of the Grimsel reservoir up to the Räterichsboden lake in the Federal Inventory of Moorland Landscapes (object No. 268 'Grimsel'). The southern perimeter boundary was drawn 27 m above the current lake level, i.e. the storage level.
KWO applied for a building permit to enlarge the Grimsel lake (2005). The Bern Administrative Court annulled the building permit in 2008, as an amendment to the concession was required; the Federal Supreme Court confirmed this in 2009. On 17 September 2010, KWO requested an adjustment of the overall concession for the project 'KWO Plus' (raising the storage level by 23 m, increasing the storage volume by 75 million m3, additional production of 240 GWh of winter electricity). The Grand Council of the Canton of Bern approved the project on 5 September 2012, subject to conditions.
The Swiss Greina Foundation and several environmental organisations lodged appeals. The Administrative Court of the Canton of Bern upheld the appeals on 22 December 2015, annulled the decision and rejected the concession application. It considered the southern perimeter boundary to be unlawful; it had to run along the current storage level, so the flooding of part of the moorland landscape was not compatible with the protection objective.
KWO filed a public law appeal with the Federal Supreme Court and requested the annulment of the lower court's decision. The Federal Supreme Court upheld the appeal.
Subject matter of the dispute: Whether the Federal Council, when first definitively delimiting the perimeter of the moorland landscape, was entitled to take into account the existing expansion plans for the Grimsel reservoir, and whether it exceeded its scope of discretion and power of assessment in doing so.
Considerations
The Administrative Court took the view that Art. 78 para. 5 Cst. contains an absolute prohibition on alteration which does not allow for any weighing of interests. The qualification and delimitation of a moorland landscape must therefore not depend on utilisation interests; the decisive factor is the situation at the valuation date of 1 June 1983, which is why future uses may not be taken into account.
The Federal Supreme Court holds that, when delimiting under Art. 23b para. 3 NCHA, the Federal Council has a power of assessment and discretion, since the statutory criteria are not so precise that they always yield unambiguous results. The requirement to take existing settlement and use into account is decisive not only when designating the moorland landscape but also when delimiting the perimeter. The legislative history and materials show that the legislator intended to grant the Federal Council a wide margin here; the concept of existing use is therefore to be interpreted broadly and also covers concrete expansion projects. A wholly new use, on the other hand, does not fall within it.
The Federal Council's freedom of decision in the definitive delimitation is broader than the scope for design and use within a moorland landscape under Art. 23d NCHA. There is no prohibition on basing the delimitation on the circumstances existing at the time of the definitive inventory; Art. 25b NCHA concerns only installations within a moorland landscape and provides no analogous basis for a retroactive delimitation. The limit of the room for delimitation lies, however, in the fact that characteristic and central elements of a moorland landscape (e.g. valuable biotopes, important geomorphological elements) must mandatorily be included in the perimeter. If the Federal Council has lawfully fixed the perimeter, it cannot subsequently reduce it in…