Facts

The construction company [C.] , represented by [B. GmbH] (respondent), submitted a building application on 27 June 2016 for the demolition of existing buildings and the construction of a four-storey multi-family residential building on parcel Gbbl. Nr. 577 in Domat/Ems. The planned project includes a small village shop on the ground floor, one 8-room apartment, five 1-room apartments, three 2½-room apartments and an underground garage with nine parking spaces. The construction parcel lies in core zone C under the municipal building act.

The appellant [A.] , owner of the adjoining parcels Gbbl. Nrs. 571-575, lodged an objection on 14 July 2016. The Municipal Executive Board of Domat/Ems granted the permit by building decision of 8 August 2016, subject to conditions and requirements, and dismissed the objection insofar as it was admissible.

On 9 September 2016 the appellant lodged an appeal with the Administrative Court of the Canton of Graubünden. On 29 November 2016 the respondent stated that it had redesigned the staircase in the northwest corner so that the entire new volume would be built within the existing building. On 11 January 2017 an on-site inspection took place, which the municipal building advisor called in by the municipality also attended. On 13 January 2017 the appellant expressly waived the opportunity to comment on the minutes of the on-site inspection.

By judgment of 14 February 2017 the Administrative Court dismissed the appeal, imposed court costs of CHF 4,485.-- on the appellant and ordered him to pay CHF 7,500.-- in party compensation to the respondent.

By public law appeal of 17 March 2017 the appellant applied to the Federal Supreme Court for annulment of the lower court's judgment and refusal of the building permit. Suspensive effect was granted. The Administrative Court, as well as the municipality and the respondent, applied for dismissal of the appeal.

Subject matter of the dispute:

  • Violation of the right to be heard (Art. 29 para. 2 Cst.)
  • Arbitrary application of municipal and cantonal building law concerning building length, façade height and exemption permit
  • Arbitrary regulation of costs and compensation in the proceedings before the lower court

Considerations

The Federal Supreme Court affirms the admissibility of the public law appeal in building law matters (Art. 82 lit. a, Art. 83 FSCA). The appellant, as a neighbour in the building law sense, is entitled to lodge the appeal (Art. 89 para. 1 FSCA). The Federal Supreme Court applies the law of its own motion, but when reviewing complaints of violation of fundamental rights, including arbitrariness, it examines only complaints that have been clearly and specifically raised (Art. 106 para. 2 FSCA). Arbitrariness exists only where not merely the reasoning but also the result is untenable.

A violation of the right to be heard is rejected. The court is not bound by the parties' arguments and may decide on a different legal basis, provided the parties could reasonably have expected that legal basis. In view of the dispute over the open form of construction and the exemption under Art. 23 para. 2 BauG, the appellant had to reckon with this reasoning. The oral assessment by the building advisor at the on-site inspection does not violate the right to be heard, since Art. 21 para. 2 BauG does not require written form, and the appellant expressly waived a statement on the minutes.

With regard to building length (maximum 12 m under Art. 23 para. 2 BauG, core zone C via Art. 9 BauG), the Federal Supreme Court characterises Art. 23 para. 2 sentence 3 BauG as a special authorisation permitting deviations in particular cases and where an architecturally good solution is guaranteed. Its purpose lies in preserving and complementing the typical settlement structure (Art. 19 para. 2 BauG), not primarily in alleviating hardship for the building owner. The lower court was entitled to treat the staggered façade with a recess of 92 cm and the integration into the village townscape, based on the building advisor and the model, as a special case. A quarter plan procedure was not required.

With regard…