Facts

The locality of "En Muraz" in Yens is governed by a neighbourhood plan (PQ) adopted in 1993 and approved in 1994, whose regulations (RPQ) provide for development in stages and an internal connecting road linking the Chanta-Merloz (north) and Sus-Vellaz (south) paths. The PQ land belongs to the company [X. SA] (the developer), except for two parcels belonging respectively to [Z.] and to [A.] and [B.] .

In 1998-1999, a first project of 16 dwellings was challenged; the Administrative Court annulled the authorisations on the ground that the permit had to be preceded by the construction of the connecting road and the adaptation of the Chanta-Merloz and Sus-Vellaz paths (judgment AC.1999.0080 of 28 June 2000). A new municipal master plan (2004) and then a general zoning plan (2010) maintained the PQ as a special plan. A request to abandon the PQ, filed in 2014 by the Association of Residents of the East of the Village of Yens, was dismissed, a decision confirmed by the Federal Supreme Court (judgment 1C_387/2016).

In 2015, the developer submitted two projects to public inquiry (construction of 13 buildings totalling 42 dwellings, and access roads, retention basin and facilities). The commune set aside the objections and issued the building permits on 13 October 2015. The project provided for a two-way southern traffic variant with a single access via the Sus-Vellaz path, closure of the Chanta-Merloz path to private traffic, and conversion of the street-square into a cul-de-sac, eliminating the traffic loop provided for in the plan.

The Vaud Cantonal Court dismissed the appeals by judgment of 31 October 2017, considering that the building permits and the facilities could be issued simultaneously and that the closure of the Chanta-Merloz path and the cul-de-sac remained compatible with the PQ and art. 63 RPGA.

Two appeals were lodged with the Federal Supreme Court: one by [A.] and [B.] (1C_655/2017), the other by the Association of Residents and co-heirs (1C_661/2017). The cases were joined. The President granted suspensive effect in case 1C_661/2017. The developer, the commune and the Cantonal Court seek dismissal of the appeals; the cantonal authorities defer to the court.

Considerations

The cases are joined in the interest of procedural economy (art. 24 FCPA and 71 FSCA). The appeal is directed against a decision in public construction law and is admissible under arts. 82 et seq. FSCA. The neighbouring owners [Z.] , [A.] and [B.] have a personal and legitimate interest in the annulment of the contested judgment (art. 89 para. 1 FSCA); the association's standing may be left open.

The Federal Supreme Court reviews the application of cantonal and communal law only from the angle of arbitrariness (art. 9 Cst.), with an enhanced requirement of reasoning (art. 106 para. 2 FSCA). The complaint that the RPQ requires staged implementation is dismissed: arts. 1, 7, 17 and 19 RPQ aim at phased execution (distinct economic reasons or owners) and do not exclude implementation at once by a single owner, which does not affect the coherence of the infrastructure.

Regarding the simultaneous issue of the building permits and the infrastructure, the cantonal court departed from the strict literal interpretation adopted in 2000, considering that arts. 14 and 31 RPQ, requiring the connecting road before any authorisation of dwellings, could be satisfied by a coordinated issue. The Federal Supreme Court holds that this solution is not arbitrary: it corresponds to the ordinary regime of art. 104 para. 3 LATC and is compatible with arts. 19 and 22 para. 2 let. b SPA, which require that the infrastructure be legally and technically secured at the latest before completion. The developer's fears are merely conjectural.

On the other hand, the complaint concerning the traffic system is upheld. The plan indicates mandatory direction arrows and two accesses (north and south); art. 2 RPQ provides that vehicles access the neighbourhood by a road linking the Chanta-Merloz and Sus-Vellaz paths, which requires opening the northern path to traffic. No provision of the regulations grants the municipality discretion permitting a departure from this; art. 76 RPGA (minor derogations) is not invoked and cannot justify calling into question a large part of the traffic system. The safety and dimensional reasons concerning the Chanta-Merloz path do not justify the solution, since an adequate redevelopment is possible (art. 31 RPQ); if…