Facts
Swisscom (Schweiz) AG (hereinafter: Swisscom) applied on 28 November 2013 to the Building Directorate of the City of Lucerne for a building permit for the construction and operation of a new mobile telephone installation on a 2.5 m high mast on the roof of an apartment building at Horwstrasse 1 and Villenstrasse 2 on plot No. 1244 GB Lucerne.
Several neighbours (the appellants, hereinafter: objectors) lodged objections. The Environmental Protection Department of the City of Lucerne and the cantonal heritage conservation authority approved the project. On 13 June 2016 the Building Directorate granted the building permit subject to conditions and requirements, dismissed the public-law objections and referred the private-law objections to the civil judge.
The objectors unsuccessfully challenged this decision before the Cantonal Court of Lucerne (judgment of 15 May 2017, 7H 16 159). By way of appeal in public law matters, they requested the annulment of the cantonal court's judgment and remittal for further investigation and a new decision on the permit. Swisscom requested non-admission, alternatively dismissal. The Cantonal Court and the Federal Office for the Environment (FOEN) requested dismissal, or stated that the judgment complied with federal environmental protection law.
Disputed issues included in particular: requests for evidence (expert report, on-site inspection) concerning the protection of the local and neighbourhood townscape; shielding of the roof against non-ionising radiation; the precautionary principle and health risks from mobile telephone installations (standard of proof, notorious fears); heritage and townscape protection (ISOS area No. 39, Art. 3 NCHA); the postponement of the permit due to an ongoing inventory revision; and equal treatment in illegality (Art. 8 Cst.).
Considerations
The appeal in public law matters is available against the final cantonal decision on construction law at the last instance (Art. 82 ff. FSCA). The objectors, as co-owners of plots within the objection perimeter and as parties to the proceedings, have standing to appeal (Art. 89 para. 1 FSCA). Although they did not make a formally reformatory request, the reasoning made clear that their aim was to refuse the permit; a substantive request is therefore present. New requests for evidence in the reply after expiry of the appeal period are out of time (Art. 95 lit. a and b FSCA; Art. 105 para. 1 FSCA; Art. 97 para. 1 and Art. 106 para. 2 FSCA).
The rejection of the requests for evidence (expert report and on-site inspection) by the Cantonal Court within the framework of anticipatory assessment of evidence is permissible under Art. 29 para. 2 Cst. The objectors opposed this assessment before the Federal Supreme Court only with unsubstantiated, appellatory criticism, which is not admissible.
On shielding: Ref. 2.12 of the operative part requires shielding of the entire roof against non-ionising radiation. From the site data sheet, which takes into account a building attenuation of 15 dB, it follows that the shielding must achieve at least this attenuation. The requirements are therefore sufficiently determinate; the objections regarding the absence of information on the type and quality of shielding are unfounded, since the attenuation is readily achievable with various materials.
On health and emissions protection: Emissions protection is governed by the EPA (Art. 1 para. 2, Art. 11 para. 2, Art. 12 EPA) and the NIRO, whose installation limit values are set according to the precautionary principle and contain a safety margin. The Federal Supreme Court continues to consider the limit values of the NIRO compliant with the Constitution and statute. The FOEN, supported by the expert group BERNIS, found no new scientifically adequate studies demonstrating a link between mobile telephone radiation and harmful or annoying effects. The objectors cited no new studies; it is for the specialist authorities to monitor research and adjustments of limit values (Art. 14 EPA), not for the Federal Supreme Court. Fear of health effects does not, according to settled case law, constitute an excessive ideal immission; the complaint of an overly strict standard of proof is therefore unfounded.
On heritage and townscape protection: Granting a building permit for a mobile telephone installation is a federal task (Art. 2 NCHA), so the authorities must spare the protected objects under Art. 3 para. 1 NCHA. The relevant surroundings of heritage buildings (position paper of the EKD) comprise only areas that are particularly important for long-distance visual effect. The lower court correctly found only a slight impairment of the ISOS townscape: the antenna (2.53 m on a building with a ridge height of 12.17 m) does not appear…