Facts
Following the flood event in Büron in August 2007, the Canton of Lucerne is planning the remediation of the Dorfbach stream in Büron. Two of the three sub-projects have already been approved with final legal effect (sediment trap in the gully area; remediation within the cantonal road project). The remediation of the stream culvert on the premises of [A. AG] in the village centre, whose flow capacity is too small to discharge extreme precipitation, is still pending. There is a risk that the culvert will collapse or become blocked during a flood and that the Municipality of Büron will be inundated over a large area. The objective is protection against a hundred-year event (HQ 100).
The appellant, a stock corporation and owner of the affected properties (historic mill building, silo building, restaurant, petrol station of Landi Sursee), lodged an objection against the project published on 21 July 2012. The Government Council of the Canton of Lucerne dismissed the objection on 15 April 2014, approved the project and ordered its implementation. The Cantonal Court of Lucerne partially upheld the appeal on 22 May 2017: it declared the report of the heritage conservation authority an integral part of the project documents and ordered the canton to carry out a subsoil investigation and safety measures on the mill building; otherwise it dismissed the appeal insofar as it was admissible. It also declined to consider the request concerning the continued operation of the petrol station, as this was not the subject of the decision.
The appellant brought an appeal in public law matters before the Federal Supreme Court and requested that the case be remitted for a new decision after taking evidence through a supplementary expert opinion on alternative remediation projects (in particular partial remediation), or alternatively that the contested decision be set aside. The Department of Construction, Environment and Economics and the Cantonal Court requested dismissal; the Federal Office for the Environment (BAFU) concluded that the project does not contravene the Federal Act on Hydraulic Engineering and Water Protection. By order of 7 September 2018, suspensive effect was granted to the appeal.
Considerations
Admissibility: The appeal in public law matters against the final cantonal decision on the merits is in principle admissible (Art. 82 lit. a, 86 para. 1 lit. d, 90 FSCA). The appellant is entitled to appeal as owner of the affected parcels (Art. 89 para. 1 FSCA). The Federal Supreme Court examines federal law ex officio; violations of fundamental rights and arbitrariness are examined only where a qualified complaint is raised (Art. 95 lit. a, 106 FSCA). Complaints concerning the facts must be substantiated (Art. 97, 105 FSCA). New evidence is admissible only insofar as the prior decision gives cause for it (Art. 99 para. 1 FSCA); the opinion of the specialist department of 29 March 2017 was qualified as a novelty but is not relevant to the decision.
Formal coordination and sub-projects: The complaint of impermissible division into sub-projects (Art. 25a SPA) was already raised and addressed in the earlier proceedings 1C_900/2013; since the other projects have become final, formal coordination is no longer possible.
Petrol station and right to be heard: The non-consideration of the request concerning the operation of the petrol station does not violate the right to be heard, since the permit was time-limited and had been operated unlawfully since 1 January 2014; the entry 'demolition after expiry of the permit' on the plan is, without arbitrariness, to be understood as a reference to restoration. The heritage conservation authority was consulted subsequently; since no structural alteration to the mill building itself is planned, the omission of its consultation does not constitute a serious defect that cannot be remedied. The violation of the right to be heard due to missing files (basic reports from other projects, remarks on the objection minutes) was cured in the cantonal court proceedings; neither an incurable non-decision nor nullity exists.
Project credit: Under cantonal law, only the allocation of costs between the canton, the municipality and interested parties is a condition for approval, not a project credit already granted; a violation of federal law or of the prohibition of arbitrariness is not substantiated.
Alternative variants and partial remediation: Authorities need only examine variants that are seriously under consideration; variants with significant disadvantages may be summarily excluded (BGE 139 II 499 E. 7.3.1). The Cantonal Court was entitled, without arbitrariness, to assume that partial remediation according to the Kohler report entails significant disadvantages from the standpoint of flood protection: the calculations in the project documents showed silting of the culvert with sediment at HQ 100, whereas the Kohler report was incomplete (missing longitudinal profiles, list calculation only as an order of magnitude, contradictory width specifications) and did not take into account the remaining sediment yield. The appellant did not substantiate these points of criticism. The authorities are not obliged to cooperate with a private expert opinion. A supplementary expert opinion could be rejected through anticipatory assessment of evidence without violating the right to be heard.
Covering and roof structure: Under Art. 38 para. 1 WPA, watercourses may not be covered or piped;…