Facts
The appellants (owners and building permit applicants) own parcel No. 6226 in Grindelwald ('Kobiszuun'), located in the agricultural zone. A traditional grazing hut with a residential section and an agricultural section stood on it. On 23 June 2009, the municipality of Grindelwald, with the consent of the Office for Municipalities and Spatial Planning (AGR), approved the expansion of the non-agricultural residential use to 68 m2 FishA and an underground level with a cellar and technical room.
After the municipality found that the load-bearing structure had been entirely renewed, it ordered a construction stop on 22 July 2010. On 17 August 2010, an amendment to the project was approved, subject to the conditions that the agricultural section may not be used for residential purposes and that the air spaces in the underground level may not be converted into storage rooms. Both prohibitions were noted in the land register. In May 2012, they were deleted without the consent of the AGR.
On 13 September 2013, the Regional Governor's Office Interlaken-Oberhasli found during a building inspection that the permits had been exceeded and, on 30 December 2013, ordered the restoration of the lawful condition. The retroactive building application of 20 February 2014, after the AGR refused the exceptional permit, was rejected by the overall decision of 4 February 2015; at the same time, dismantling measures were ordered (reduction of the residential rooms to the approved size, prohibition of residential use in certain rooms, replacement of windows with gates, backfilling of the foundation space with a service opening).
The Directorate of Construction, Transport and Energy (ACI) dismissed the appeal on 8 March 2016, and the Administrative Court of the Canton of Bern did so on 12 December 2016. The appellants lodged a public law appeal with the Federal Supreme Court and requested annulment and remittal as well as suspensive effect, which was granted by order of 23 February 2017. The lower instances and the Federal Office for Spatial Development requested dismissal.
Main points in dispute: the approvability of the retroactive building application under former Art. 24c SPA and former Art. 42 SPO (expansion or reconstruction, countable areas, 30% limit), the lawfulness of former Art. 42 para. 3 SPO, the legal force of the foundation space, and the proportionality of the restoration measures.
Considerations
The Federal Supreme Court entered into the appeal (Art. 82 let. a, 86 para. 1 let. d, 89 para. 1, 90 FSCA). New facts and evidence, such as a confirmation from a former tenant submitted for the first time before the Federal Supreme Court and a file note of 20 July 2017, were not considered as inadmissible genuine novas (Art. 99 para. 1 FSCA). The application of the old law (former Art. 24c SPA and former Art. 41 et seq. SPO) was confirmed, since the new law is not more favourable to the appellants.
With regard to the countable areas, it was noted that the two alleged storage rooms in the agricultural section can no longer be proven and that the consequences of the lack of evidence fall on the appellants; there is no presumption in favour of a use not in accordance with the zone, since the rooms do not have a close structural and functional connection to the dwelling. The question of whether the children's sleeping room is countable was examined but is not decisive.
The expansion took place both within the existing building volume (residential and storage rooms) and outside it (cellar, technical room, foundation space), which is why let. b of former Art. 42 para. 3 SPO applies: the total expansion may not exceed 30% of the area used in a manner not in accordance with the zone, or 100 m2, whereby internal expansions are counted only at half. This rule also applies to reconstructions (former Art. 42 para. 4 SPO). Functional areas count as ancillary areas just as ancillary utility areas do. The calculation requested by the appellants under let. a (without limitation of ancillary areas) is applicable only to an expansion located entirely within the building volume. The limit was also exceeded when considering the FishA in isolation. A partial permit therefore does not come into consideration. The enlargement of the window on the south facade was rightly not approved.
The lawfulness of former Art. 42 para. 3 SPO was affirmed with reference to the judgment 1C_415/2014: the materials show no deviation from the will of the legislature; expansions and reconstructions are…