Facts

Salt Mobile SA (formerly Orange Communications SA) applied on 27 January 2015 to the City of Lucerne for a permit for a new mobile telephony transmitter installation on a building at Wesemlinstrasse in Lucerne (plot No. 443). Planned are technical infrastructure in the basement and three antennas with frequencies of 800-900 MHz (400 watts ERP) and 1800-2100 MHz (900 watts ERP). The antenna panels are to be mounted on a mast projecting 3.5 m above the roof ridge at 17.2 m above elevation datum 0 and transmitting in main radiation directions of 310°, 120° and 215°.

Neighbours from Wesemlinrain (four appellants, acting as a group) filed objections, which were maintained even after submission of a revised site data sheet dated 12 June 2015 and a revised situation plan.

By decision of 16 August 2016, the Building Directorate of the City of Lucerne granted the permit subject to conditions and requirements, dismissed the objections under public law and referred private-law concerns to the civil judge. The Cantonal Court of Lucerne dismissed the appeal filed against this on 21 October 2017.

Before the Federal Supreme Court, the appellants applied for annulment of the judgment of the cantonal court and of the building permit decision, and for dismissal of the building application, or alternatively for remittal. They complained of denial of the right to be heard, violation of federal law and arbitrary application of cantonal law. The respondent, the cantonal court and the Federal Office for the Environment (FOEN) applied for dismissal or considered the project compliant with federal environmental law; the Federal Office of Culture (FOC) considered the impairment of the townscape acceptable. By order of 11 January 2018, the President had granted suspensive effect to the appeal.

The subject matter of the dispute included in particular: application for an inspection in loco, deficiencies in the site data sheet, right to be heard (reasons, site evaluation, antenna diagrams), radiation protection under EPA and NIRO, nature and heritage protection (NCHA, ISOS) and arbitrariness in the application of § 140 PTA LU.

Considerations

The appeal in public law matters is admissible against the final cantonal judgment (Art. 82 let. a, Art. 86 para. 1 let. d, Art. 90 FSCA). Only the judgment of the Cantonal Court is contestable (devolutive effect); however, the building permit decision is deemed to be contested in substance as well. The appellants are legitimated as neighbours at a distance of approximately 40 m and as parties to the proceedings (Art. 89 para. 1 FSCA). The 30-day time limit (Art. 100 para. 1 FSCA) was complied with, with posting on 8 December 2017 following service on 8 November 2017.

The Federal Supreme Court only reviews violations of federal law (Art. 95 FSCA), and for cantonal law only arbitrariness, and bases its review on the facts established by the lower court unless they are manifestly incorrect (Art. 105 FSCA). The application for a federal inspection in loco is dismissed, since the parties to the proceedings were able to express themselves without restriction, an inspection in loco has already taken place, and the FOEN explains that even complex roofs can now be shielded. An error identified in the site data sheet (identical coordinates for locations 01a and 01b; shielding not consistently taken into account) is to be corrected but is not legally decisive; the correction is the responsibility of the Building Directorate.

On the complaint of denial of the right to be heard: the reasoning of the 38-page cantonal judgment is sufficient, since the appellants were able to challenge it appropriately. The site evaluation mentioned in the building permit decision did in fact not take place; the cantonal court's assumption that such an evaluation is voluntary and not legally required in the City of Lucerne is not contrary to federal law. There is no right of access to non-existent documents, even if the misleading passage in the decision constitutes an oversight. The use of enveloping antenna diagrams for frequency bands is permissible according to case law (judgment 1C_254/2017 consid. 4 and 5). The invocation of the Aarhus Convention was first made in the reply and is not sufficiently substantiated; a direct individual-law invocation has not been shown.

On radiation protection: EPA and NIRO regulate immission control exhaustively, so that no room remains for municipal and cantonal law (BGE 138 II 173). Installation limit values, immission limit values and places of sensitive use (OMEN) as well as places of short-term stay (OKA) must be complied with. The site data sheet contains the required information, apart from the correctable inconsistency. Condition 2.10 requires complete roof shielding before commissioning, and condition 2.6 requires independent measurement three months after…