Facts

Parties and authorities: The appellants are [A.A.] and [B.A.] , owners of the neighbouring plot no. 792 (the objecting neighbours). The respondents are [C.] and [D.] , new owners of plot no. 106, represented by a lawyer. Also parties are the Municipality of Crans (hereinafter: the Municipality), the Cantonal Fire and Natural Hazards Insurance Establishment (ECA), the General Directorate of the Environment of the canton of Vaud (DGE) and the Administrative and Public Law Chamber of the Vaud Cantonal Court (CDAP).

Subject matter: supplementary building permit.

Procedural history:

  • By decision of 30 May 2018, issued after the annulment of an earlier decision, the Municipality authorised the construction of a family villa with a car port on plot no. 106, located partly in the Bourg zone and partly in a green zone. The neighbours' objection was dismissed. By judgment of 7 December 2018, the CDAP upheld this decision, holding in particular that a new public notice was not necessary. By judgment of 7 November 2019 (1C_46/2019), the Federal Supreme Court dismissed the objectors' public law appeal.
  • On 15 April 2021, the Municipality informed the new owners that the works included changes compared with the permit. A supplementary public notice application was filed on 8 July 2021, concerning interior fittings, solar panels and the creation of a gabion retaining wall. The neighbours objected.
  • By decision of 14 March 2022, the Municipality issued the supplementary building permit, requiring a reinforced concrete wall in place of the gabion wall, at the location of the existing low wall.
  • By judgment of 8 November 2022 (AC.2022.0128), the CDAP dismissed the neighbours' appeal. It held that the decision was sufficiently reasoned, that the concrete wall met the requirements of the ECA (specialist authority on natural hazards), that the modifications did not make the basement habitable, that the removal of the mixed use was compliant with the new construction regulations, and it confirmed the other elements of the permit.

Conclusions and proceedings before the Federal Supreme Court: By appeal of 9 December 2022, the neighbours request the annulment of the municipal decision of 14 March 2022, the suspension of the works until the stabilisation of the plot and the zone, and, failing that, the removal of the existing construction and the restoration of the land. The suspensive effect was granted on 2 February 2023. The CDAP waives submitting observations. The ECA does not submit conclusions but recalls its requirements. The Municipality concludes for dismissal. The respondents conclude that the appeal is inadmissible, or alternatively that it be dismissed.

Main question: is the supplementary building permit, in particular the concrete retaining wall, compliant with building law, water protection, nature and forest protection, and the right to be heard?

Considerations

Admissibility: The appeal is directed against a final decision (art. 90 FSCA) rendered as the last cantonal instance (art. 86 para. 1 let. d FSCA) in the field of public building law (art. 82 let. a FSCA). The appellants, neighbouring owners particularly affected, have a personal and legitimate interest in the annulment of the judgment and therefore have standing to appeal (art. 89 para. 1 FSCA). The appeal is in principle admissible.

Establishment of the facts: The Federal Supreme Court relies on the facts established by the previous authority (art. 105 para. 1 FSCA), subject to exceptions (art. 105 para. 2 FSCA). A challenge to the facts is admissible only if those facts were established in a manifestly inaccurate manner (arbitrarily) or in violation of the law (art. 97 para. 1 and 95 FSCA), and if the correction is capable of affecting the outcome of the case; the appellant must explain this in a detailed manner (art. 106 para. 2 FSCA). Details concerning the destruction of the former wall and the date of authorisation to commence works are not relevant to the admissibility of the wall at issue. For the rest, the cantonal judgment recalls the intended use of the plot, its location in a zone of low landslide hazard and in an Au water protection sector, as well as the requirements of the DGE and the ECA's positions of 2017, 2021 and 2022. The complaints regarding the facts are therefore dismissed.

Right to be heard (art. 29 para. 2 Cst.): The appellants argue that construction of the villa could not begin before the retaining wall was built, the slab having been poured in May 2021 whereas the former wall had been destroyed in December 2020, which would be contrary to art. 89 LATC. The Federal Supreme Court recalls that the duty to give reasons derives from the right to be heard and allows the person concerned to understand the decision and the appellate authority to exercise its review. The decision on objection concerns the project subject to the supplementary public notice; the order of carrying out the works and the works already authorised are foreign to the subject matter of the dispute. The Municipality responded to the points raised; the absence of any mention of the regulatory provisions did not deprive the appellants of the opportunity to assert their complaints. Any possible violation would in any event be remedied before an authority with full power of review (ATF 142 II 218). The complaint based on the failure to take a position on the wall in the green zone, raised late in the second reply, did not call for a specific response and was unsubstantiated. The formal complaint is dismissed.

Hydrogeological report and water protection: The appellants criticise the CDAP for not having examined the absence of a hydrogeological report for the wall, invoking art. 25a SPA, 10 para. 2 WPA and 32 para. 2 let. f WPO. Under the reasoning requirement of art. 42 para. 2 FSCA, the appellant must engage with the considerations of the contested decision; appellate-style criticism is inadmissible, and complaints of fundamental rights are subject to a heightened reasoning requirement (art. 106 para. 2 FSCA). The cantonal…