Facts

Parties and subject matter of the proceedings: The appellants are [A.] (owner of parcel 3265 on the opposite side of the street) and [B.B.] and [C.B.] (co-owners in condominium ownership of parcel 3266). The respondent is the simple partnership '[D.] ', consisting of the [E. AG] and the [F. AG] . The municipality of Vaz/Obervaz is also a party. The subject matter is a building objection. Two judgments of the Administrative Court of the Canton of Graubünden (5th Chamber) of 22 June 2017 (R 16 67) and of 12 March 2019 (R 18 29) are contested.

Facts: The simple partnership is the owner of parcel 3350 on [G.] street in Vaz/Obervaz. The property lies in the core zone with a floor space index of 1.0. The existing building has a creditable gross floor area (FishA) of 528.5 m2 and is attached on the north side to parcel 3260.

On 21 April 2016 the municipal executive board approved a replacement new construction: demolition of the existing building with five apartments and reconstruction with four apartments and garages, partly within the area of the existing old building, subject to conditions and an exemption permit regarding the street setback. The objections of the appellants and other neighbours were dismissed.

First judgment of 22 June 2017: The Administrative Court upheld the appeal, annulled the construction and objection decision as well as the building permit, and remitted the matter to the municipality to examine whether sufficient FishA was available. The part lying within the existing building volume could be erected without creditable FishA; the part lying outside may only consume the zone-compliant utilisation of 335 m2 FishA. Further complaints (boundary and street setback, parking spaces, secondary residences, light and views) were dismissed. The judgment was not appealed.

Municipal decision of 26 April 2018: The municipality dismissed the objection and, subject to conditions, granted the building permit. It referred to the judgment of 22 June 2017 and stated that the construction project complied with the floor space index outside the existing building envelope. The Administrative Court granted suspensive effect to the appeal.

Second judgment of 12 March 2019: The Administrative Court did not enter into the appeal because the complaints had already been decided. It held that the result of the judgment of 22 June 2017 was not manifestly objectionable: the new FishA inside and outside the volume amounts to 527.3 m2 and does not exceed the former FishA of 528.5 m2.

Proceedings before the Federal Supreme Court: The appellants request the annulment of both judgments and the rejection of the building application. The respondent requests non-entry, alternatively dismissal. The municipality submitted no observations. By presidential order of 3 July 2019, suspensive effect was granted to the appeal.

Legal question: Whether the judgment of 22 June 2017 is to be classified as an appealable final decision or as an interlocutory decision, and whether the application of Art. 9 para. 1 BauG (homestead right) and Art. 62 para. 4 BauG (utilisation in the core zone) is arbitrary.

Considerations

Admissibility and classification of the remittal decision: The appeal in public law matters is available (Art. 82 let. a, Art. 86 para. 1 let. d, Art. 90 FSCA; Art. 34 para. 1 SPA). Remittal decisions are in principle interlocutory decisions, even where material aspects are decided. Only where the lower instance no longer has any room for decision and the remittal serves merely to implement the decision is it a (quasi-)final decision. The judgment of 22 June 2017 is to be classified as an interlocutory decision, which under Art. 93 para. 3 FSCA is challengeable together with the final decision, insofar as it affects its content. Since the Administrative Court did not address the complaints in the judgment of 12 March 2019 because they had already been decided, the remittal decision had an effect. The appeal is therefore admissible against both judgments. The other conditions for admissibility of the appeal are met.

Complaint of violation of the right to be heard: The complaint that Art. 62 para. 4 BauG was not applicable and remained unassessed is unfounded. In the judgment of 22 June 2017 the Administrative Court expressly relied on Art. 62 para. 4 BauG and substantiated its applicability. The decision of non-entry does not violate the right to be heard (Art. 29 Cst.).

Arbitrariness under Art. 9 para. 1 BauG (homestead right): Arbitrariness exists where a decision is obviously untenable, or grossly violates a norm or an undisputed principle of law; furthermore, the Federal Supreme Court only annuls where the result is also untenable. The homestead right under Art. 81 para. 3 CRA/GR and Art. 9 para. 1 BauG permits reconstruction after destruction or demolition only to the former extent and with the old building dimensions. The Administrative Court overlooked the clearly required aspect of the identity or substantial comparability of the replacement building. The planned building has an entirely new, curved, elongated floor plan whose east and west facades are more than twice as long. Applying the homestead right to the former building volume without examining this comparability is therefore untenable.

Arbitrariness under Art. 62 para. 4 BauG (core zone): The provision applies to conversions and renovations of existing buildings erected before 1 January 1998, under which no floor space index applies within the existing building volumes. A demolition with replacement new construction, with five instead of four apartments and a different building structure, is neither a conversion…