Facts

The respondent (building owner) is the owner of plot Wohlen Gbbl. No. 4373 in Innerberg (municipality of Wohlen bei Bern), which is zoned as a single-storey residential zone. The appellant (neighbour) is the owner of the adjoining plot No. 4372.

The neighbour accused the building owner of unauthorised earthworks (ground build-up) on the construction site and demanded the restoration of the lawful condition. The Municipality (EG) of Wohlen dismissed this request on 8 July 2011; the Directorate of Construction, Transport and Energy (ACI) confirmed this on 24 November 2011. The Administrative Court of the Canton of Bern set aside the decision on 6 November 2012 and instructed the ACI to carry out investigations for the last five years before 8 July 2011. After an expert report, the ACI confirmed the order on 30 October 2013; this decision was not challenged.

On 30 October 2012 the building owner submitted a building application for the construction of an underground garage, a garden shelter and a terrace. After revision and public display, the neighbour lodged an objection. The EG Wohlen dismissed the objection on 15 May 2014 and granted the building permit subject to conditions and requirements. Following a technical report from the Office of Geoinformation (AGI) and a project amendment (retaining wall), the ACI approved the amendment on 7 August 2015 and dismissed the neighbour's appeal insofar as it was admissible. It allocated the costs in a ratio of nine to one against the neighbour. The Administrative Court dismissed the appeal on 31 May 2016.

The neighbour lodged a public law appeal with the Federal Supreme Court and requested the annulment of the decisions and the refusal of the building permit, alternatively remittal. The EG Wohlen, the Administrative Court and the building owner requested dismissal. In the proceedings the neighbour filed several supplements, some of which were late; he further alleged new earthworks since 15 September 2016 and requested the granting of suspensive effect as well as a prohibition on building under threat of penalty pursuant to Art. 292 SCC.

The essential issues in dispute are: the admissibility of the supplements to the appeal, the admissibility of new facts and evidence, the violation of the right to be heard through anticipatory assessment of evidence (rejection of plans, witness examination and expert opinion), the relevance of unauthorised ground build-up for the building permit, and the allocation of costs.

Considerations

The public law appeal against the final cantonal decision in building law is admissible under Art. 82 ff. FSCA, BGE 133 II 353. The neighbour has standing to appeal as owner of an adjoining property (Art. 89 para. 1 FSCA; cited in the text as Art. 86 para. 1 FSCA). In principle, the appeal is to be entertained.

The 30-day appeal period (Art. 100 para. 1 FSCA) expired on 11 July 2016; the period cannot be extended (Art. 47 para. 1 FSCA). The later supplements of 18 and 27 September as well as 18 October 2016 are therefore in principle late and are not to be taken into account, except for remarks on submissions by the parties to the proceedings.

The grounds of complaint are limited to federal law, international law and cantonal constitutional rights (Art. 95 FSCA). Cantonal law may only be challenged on the ground of arbitrariness (BGE 138 I 143). The complaint of arbitrariness must be substantiated (Art. 106 para. 2 FSCA, Art. 9 Cst.); purely appellatory criticism is inadmissible. The Federal Supreme Court bases its decision on the facts established by the lower court (Art. 105 para. 1 FSCA), unless they are manifestly incorrect or based on a violation of law (Art. 97 para. 1 FSCA).

New facts and evidence are only admissible insofar as the lower court's decision gives cause for them (Art. 99 para. 1 FSCA). Genuine novae, i.e. facts arising after the contested decision, are inadmissible. The alleged earthworks since September 2016 therefore cannot be taken into account. Photographs and Google Maps extracts relating to ground build-up before the judgment of the lower court are likewise inadmissible, since the neighbour had already asserted such build-up in the cantonal proceedings.

On the right to be heard: the authority may reject requests for evidence within an anticipatory assessment of evidence if it can, without arbitrariness, assume that its conviction would not change through further evidence (BGE 141 I 60). The ACI and the Administrative Court rejected the undated plans of a surveying engineer submitted as exhibits 10a and 10b, because the scale was missing, there was no connection to the AGI measurements, and the plans had not been prepared for the building project. The rejection of the witness examination and of an independent expert opinion was therefore not arbitrary. The neighbour did not explain why the AGI measurement points were supposedly selected incorrectly. The investigative principle does not give rise to a right to the admission of evidence that is not required. A violation of the right to be heard and a breach of the investigative principle therefore do not exist.

On the subject matter of the dispute: the subject matter of the proceedings is the building application of 30 October 2012. The restoration of the…