Facts

The plot No. 7510 in Kirchberg (district of Gähwil) lies in the agricultural zone, belongs to the Iddaburg landscape protection area and is located in the BLN area No. 1420. A residential building with an attached barn and a pigsty stood on it.

The respondent or appellant [A.] acquired the plot and in 2004 applied for the conversion of the residential building and the change of use of the agricultural buildings for leisure farming. In September 2004 the building authority granted the building permit after the cantonal AREG had given its consent (Art. 24a and 24d SPA).

In June 2005 the building authority ordered a construction stop because the owner had reported extensive deviations: due to poor structural condition, the entire lower, ground and upper floors had been gradually demolished and rebuilt. A subsequent building application was not approved by the AREG; in October 2005 the building authority refused the building permit and ordered the demolition of the residential building. The legal remedies remained unsuccessful, most recently by judgment 1A.23/2007 of 31 July 2007 of the Federal Supreme Court. The demolition order was not enforced; applications for agricultural uses were rejected due to non-conformity with the zone.

On 15 December 2012 [A.] filed a building application for the completion of the residential building, referring to Art. 24c para. 3 SPA, in force since 1 November 2012. On 5 February 2013 WWF Switzerland lodged an objection. The AREG refused approval in July 2013; the building authority rejected the building application on 18 September 2013 and upheld the WWF's objection. On 26 August 2014 the Department of Construction dismissed [A.] 's appeal, imposed the costs on him and awarded the WWF a party compensation of CHF 2'527.20.

On 27 April 2016 the Administrative Court of the Canton of St. Gallen annulled the party compensation because the WWF's objection had been untimely, and otherwise dismissed the appeal.

Against this decision both [A.] (proceedings 1C_303/2016) and the WWF (proceedings 1C_301/2016) filed appeals in public law matters with the Federal Supreme Court. The proceedings were joined.

The subject matters of dispute are (1) whether the reconstruction or completion of the residential building is permissible under Art. 24c para. 3 SPA and (2) whether the municipality rightly admitted the WWF's untimely objection on grounds of protection of legitimate expectations and whether the WWF is entitled to party compensation.

Considerations

The appeal of the WWF (1C_301/2016) was deemed admissible because the WWF has a legally protected interest in setting aside the decision that denies it party status and alters the costs to its detriment (Art. 89 para. 1 FSCA). The appeal of [A.] as owner and building applicant is also admissible insofar as the rejection of the building application was confirmed. The Federal Supreme Court examines federal law in principle ex officio; violations of fundamental rights are examined only if properly raised (Art. 95, 106 FSCA).

Regarding the reconstruction: under Art. 24c paras. 2 and 3 SPA, a building that no longer conforms to the zone may be rebuilt after voluntary demolition, provided it was lawfully erected and was still capable of being used as intended at the time of demolition, and an uninterrupted use interest exists (Art. 42 para. 4 SPO). The lower court denied the capacity for use as intended based on the poor structural condition described by the appellant himself. The objection of manifestly incorrect establishment of the facts is rejected: the statements from 2005 relate to the original structural fabric, and the appellant had replaced it on his own initiative without having it examined or documented by the authorities. If the load-bearing beams and walls had to be replaced entirely, the denial of capacity for use as intended is consistent with federal law.

Since the reconstruction cannot be approved for this reason alone, there is no need to examine whether the unlawful demolition precludes a permit and whether the other requirements of Art. 24c SPA and Art. 42 SPO are met. Appeal 1C_303/2016 is therefore dismissed; the authority must enforce the demolition order in place since 2007.

Regarding the party status of the WWF: it is undisputed that the objection was filed after the expiry of the 14-day cantonal public display period (Art. 82 para. 3 and 83 para. 1 BauG/SG). The construction notice described the project as a 'conversion' with reference to Art. 24c SPA, although it concerned the completion of a building subject to a final demolition order. The WWF made inquiries with the municipality within the public display period; the information was provided on 29 January 2013 and the objection was filed on 5 February 2013. Under Art. 12b NCHA, decisions and applications must be notified to organisations entitled to appeal in such a way that they…