Facts
The appellant (owner of a plot in the core zone I on Lake Zug in U.) submitted a revised building application on 5 October 2012 to the Küssnacht District Council for the demolition of the existing building and the construction of a single-family house with two outbuildings. The neighbours (respondents) lodged objections.
The Office for Spatial Development of the Canton of Schwyz granted the cantonal building permit on 9 July 2014, subject to conditions, and dismissed the objections. The Küssnacht District Council confirmed on 3 September 2014 the building permit for the replacement building and an exceptional permit for undercutting the watercourse distance.
The Government Council of the Canton of Schwyz partially upheld the objectors' appeal on 25 August 2015, by refusing permission for the terrace and the paved path; in all other respects it dismissed the appeal. The Cantonal Administrative Court of the Canton of Schwyz (Chamber III) upheld the objectors' appeal by judgment of 27 January 2016 and set aside the Government Council's decision, the District Council's decision and the overall decision of the Office for Spatial Development.
The Administrative Court reasoned that the planned structure within the watercourse area was not located in a densely built-up area, so that no exceptional permit under Art. 41c para. 1 lit. a WPO could be considered. Nor was an exception under § 73 PTA/SZ for undercutting the watercourse distance to be granted, since no special circumstances existed, in particular no unreasonable hardship or better solution.
On 29 February 2016 the appellant lodged a public law appeal with the Federal Supreme Court, requesting that the lower court's judgment be set aside and that the building permit for the replacement building be confirmed. The Administrative Court requested dismissal of the appeal; the respondents did likewise. The Federal Office for the Environment concluded that the contested decision was compatible with federal environmental law.
The essential question in dispute is whether the requirements for an exceptional permit for undercutting the watercourse distance (under cantonal law pursuant to § 73 PTA/SZ, or under federal law pursuant to Art. 41c WPO) are met. The lake shore distance is 15.26 m (instead of 20 m); the structure occupies 67.4 m2 of the watercourse area.
Considerations
The Federal Supreme Court admits the appeal, as it concerns a final cantonal decision on a building permit (Art. 82 lit. a, Art. 86 para. 1 lit. d, Art. 90 FSCA; no exclusion ground under Art. 83 FSCA). The appellant, as building applicant, has standing (Art. 89 para. 1 FSCA).
Under Art. 42 para. 2 FSCA, the appeal must be sufficiently reasoned; purely appellatory criticism is not sufficient. For complaints of violation of fundamental rights, including arbitrary application of cantonal law, stricter requirements apply (Art. 106 para. 2 FSCA). The appellant essentially repeated the positions of the Government Council without showing to what extent the judgment violates federal law or the constitution; the reasoning requirements are questionable, but this may be left open.
The Canton of Schwyz has not yet designated the watercourse area for Lake Zug, which is why the use restrictions of Art. 41c paras. 1 and 2 WPO apply to a 20 m wide strip. Art. 41c para. 1 lit. a WPO permits exceptions only in densely built-up areas; the Administrative Court denied such an exception. The protection of existing structures under Art. 41c para. 2 WPO does not apply, since under cantonal law the project within the building zone enjoys no such protection. Section 66 para. 1 PTA/SZ also requires a minimum distance of 20 m from lakes.
Cantonal law (§ 73 PTA/SZ) is stricter than the WPO: it requires special circumstances, in particular unreasonable hardship or a better solution, whereas Art. 41c para. 1 lit. a WPO already accepts the location in a densely built-up area as sufficient. Such a…