Facts

Parties and instances: The appellant is a joint-stock company ([A. AG] ), which extracts gravel in the Nassenfeld area southwest of the municipality of Neckertal and is the applicant as well as owner of numerous plots of land in Nassenfeld. It is represented by a lawyer. Parties to the proceedings are the Political Municipality of Neckertal (Municipal Council), the Government of the Canton of St. Gallen, acting through the Department of Construction, as well as four landowners in the planned extraction area. The lower instance is the Administrative Court of the Canton of St. Gallen by decision of 24 March 2015.

Subject matter: Gravel extraction Nassenfeld Süd.

Chronology:

  • First extraction permit on 27 March 1975. On 23 May 2002 the appellant submitted extraction and deposit plans together with an environmental impact report (sub-areas East and South with sub-sections Central and West). In total, 3.7 million m3 of gravel are to be extracted, of which approximately 500,000 m3 lie in the groundwater (sub-area South-Central).
  • On 10 February 2004 the Municipal Council approved gravel extraction in sub-area East. On 30 April 2004 the Department of Construction approved the extraction plan, but not the deposit plan.
  • On 23 April 2004 the Office for Environmental Protection (AFU) refused the water protection permit for sub-area South and did not enter into the deposit application. The area lies in the Au water protection zone, in which gravel extraction below the groundwater table is impermissible. On 20 January 2003 the Cantonal Forestry Office additionally refused the clearing permit for the same reasons.
  • The Municipal Council rejected the approval of the extraction and deposit plan for South (notification October 2004).
  • The Government dismissed the appeal on 25 April 2006. On 27 February 2007 the Administrative Court partially upheld the complaint and instructed the Government to obtain an expert opinion on whether a coherent groundwater field exists, or whether in sub-area Central there is an isolated basin sufficiently productive for emergency supply (threshold 230 l/min).
  • In sub-area South-Central, the geological firm [F. AG] (for the appellant), with AFU consent, carried out the hydrogeological site assessment dated 30 June 2009, on 9 October 2009. According to it, sub-area Central is hydrogeologically separate; the demonstrated productivity is 100-120 l/min (52,500-63,000 m3 per year); the natural reservoir contains an estimated 80,000 m3, of which approximately 50,000 m3 are technically usable. The drinking water requirements are met; traces of lead and volatile hydrocarbons were detected in two springs in 2005.
  • On 1 May 2012 the Government dismissed the appeal and, based on the site assessment, assumed that the deposit is at least suitable for emergency drinking water supply; the assignment to the Au water protection zone is factually justified. On 24 March 2015 the Administrative Court dismissed the appeal.

Requests before the Federal Supreme Court: The appellant requests that the decisions of 24 March 2015 and 27 February 2007 be set aside and the matter be remitted to the Government. The Administrative Court and the Department of Construction request dismissal. The Municipal Council supports the appeal, as there is no need. The FOEN considers the contested judgment consistent with federal law; the Federal Office for Spatial Development waived submission of observations.

Central legal question: Whether sub-area Nassenfeld Central was lawfully assigned to the Au water protection zone, which excludes gravel extraction below the groundwater table, and whether the assignment is reviewable incidentally, and whether a balancing of interests must be carried out.

Considerations

Admissibility: The appeal in public law matters is open against the final cantonal decision on the merits (Art. 82 let. a, 86 para. 1 let. d, 90 FSCA). The appellant has standing as applicant and landowner (Art. 89 para. 1 FSCA). The appeal is timely (Art. 100 para. 1 FSCA); it is therefore admitted.

Legal framework and prohibition of gravel extraction below the groundwater table: Under Art. 44 para. 2 let. b WPA, a permit for gravel extraction below the groundwater table may not be granted if the groundwater resource is suitable for water extraction in terms of quantity and quality. Above it, a permit may be granted if a protective layer of material is retained (para. 3). No. 211 para. 3 let. a Annex 4 WPO requires, in the Au water protection zone, a protective layer of at least 2 m above the ten-year groundwater maximum level. Under No. 111 Annex 4 WPO, the Au water protection zone comprises the usable underground waters and the marginal areas necessary for their protection. Since sub-area Central is assigned to the Au water protection zone, the planned extraction below the groundwater table is impermissible.

Incidental review: Water protection zones are binding only on authorities, not on landowners, and cannot be challenged directly, but they may be reviewed incidentally as to their lawfulness in a concrete application. The appellant is therefore entitled to contest the assignment.

Complaints concerning the facts (novelty): The challenge to the groundwater recharge rate (100-120 l/min) and the objection that existing embankments have an adverse effect on groundwater were raised only in the reply or submission of 8 February 2016 and are therefore out of time (Art. 42 para. 1 and Art. 43 FSCA e contrario); a manifest error (Art. 105 FSCA) has not been shown. Insofar as the complaint relates to planned embankments not yet permitted, it is not capable of undermining the findings of fact.

Quantitative suitability: The appellant complains that the lower instance disregarded the remittal benchmark of 230 l/min. The Federal Supreme Court finds no binding effect: the Administrative Court did not intend to set a reference value, but to require an overall assessment. The reference value of 10 l/s from judgment 1C_284/1995 of 1 November 1996 (obiter dictum, under the former WPA and the FOEFL guidelines) is outdated. Under the WPO (No. 111 para. 2 let. a Annex 4), it suffices that water is present in its natural or enriched state in a quantity such that use 'may come into consideration'; demand is expressly not to be taken into account (cf. also BGE 103 Ib 296 E. 2b). The current guidelines (2004) no longer contain a reference value; decisive is a possible contribution to regional or municipal supply, including emergency supply. The Eastern Swiss implementation aid relies on extent and…