Facts

The Vaud cantonal master plan for excavation material deposits (PDDEM), established in 1997 and regularly updated, designates as a priority the excavation material deposit site (DMEX) of Creusaz, on parcel no. 82 of the Municipality of Coinsins. The site, with an area of 174'876 m2, adjoins the A1 motorway and is to receive the permanent storage of 610'000 m3 of clean materials over approximately 4 years, before being returned to agricultural zone.

The company [A. Sàrl] operates the site. A cantonal development plan (PAC no. 326) was established; during the public inquiry, the Municipality of Coinsins filed an objection.

On 15 July 2013, the Head of the Vaud Department of the Interior approved PAC no. 326 as part of the final decision on the environmental impact assessment, dismissing the objections and subjecting the plan to operating conditions. Seized by several opponents, including the municipality, the Administrative and Constitutional Law Chamber of the Vaud Cantonal Court confirmed this decision by judgment of 17 July 2015.

The municipality lodges a public law appeal before the Federal Supreme Court and seeks the annulment of the cantonal judgment and of the decision approving the PAC, or alternatively the remittal of the case. The cantonal court seeks dismissal; the Directorate-General for the Environment also seeks dismissal; the other authorities defer to the court or decline to submit observations. The President of the First Public Law Division rejected the request for suspensive effect.

The complaints concern: the refusal to erect profiles and to extend the local inspection (right to be heard); the modification of the pipeline route without a new public inquiry or hydrogeological study; the expiry of a federal authorization from the Federal Pipeline Inspectorate (DETEC) linked to a gas pipeline; and the infringement of the landscape, constituting a violation of municipal autonomy.

Considerations

As to admissibility, the public law appeal (arts. 82 et seq. FSCA) is open against a decision of last cantonal instance relating to spatial planning law. Within the meaning of art. 89 para. 2 let. c FSCA, the municipality has standing to appeal by invoking the violation of its autonomy guaranteed by the Constitutions. Whether it is in fact autonomous is a question of substance. The appeal is therefore admissible.

As to the right to be heard (art. 29 para. 2 Cst.), the authority may terminate the taking of evidence when the evidence administered has enabled it to form its conviction and a non-arbitrary anticipatory assessment confirms it. In this case, the 3D modelling in the impact report and the local inspection carried out by the first-instance judges, whose composition included specialist assessors, were sufficient. The municipality could have produced its own means of evidence and did not request other viewpoints during the inspection. No violation is demonstrated.

As to the pipeline route, a new public inquiry was not necessary: the pipeline plan does not form an integral part of the file or of the disputed plan, the final decision merely refers to the document relating to the new collector, whose construction must precede the deposits, and a separate procedure for revising the municipal wastewater disposal plan (art. 25 LPEP) remains reserved. The Federal Supreme Court notes that coordination within the meaning of art. 25a SPA could be debated, but that the modification is a matter of expediency and that the construction of the deposit does not depend on it. As to the authorization of the Federal Pipeline Inspectorate, its validity is by nature limited to one year, and art. 26 PipeO in any event requires an authorization before works begin, independently of the PAC; the complaint is dilatory and does not call into question the validity of the plan.

On the merits, municipal…