Facts

The respondent (owner) owns the Aeschiried holiday centre in the mixed municipality of Aeschi b. Spiez (parcel Gbbl. Nr. 646). The centre lies within the scope of the development regulations 'Stiftung Blaukreuzheim Aeschiried' of 28 May 1999. The holiday home consists of the wings 'Seeblick' and 'Chalet'.

By contract dated 22/24 September 2014, the foundation leased the wing 'Seeblick' from 1 October 2014 to the Canton of Bern as a collective accommodation for asylum seekers (transit centre). The wing 'Chalet' is no longer operated as a holiday home.

The appellants, owners of the parcel Gbbl. Nr. 657 about 120 metres away, requested inspection of the files and the opening of a building permit procedure. By decision of 14 November 2014, the Regierungsstatthalteramt Frutigen-Niedersimmental held that no building permit procedure was necessary if use were limited to a maximum of 100 beds, but that any expansion beyond that required a building permit. The Directorate of Construction, Transport and Energy dismissed the appeal filed against this on 22 December 2014, and the Administrative Court of the Canton of Bern did so on 22 April 2015.

Before the Federal Supreme Court, the appellants request a declaration that the conversion requires a building permit; in the alternative, remittal. The lower instances and the respondent request dismissal of the appeal.

The subject matter in dispute is whether the conversion of the holiday centre into a transit centre for asylum seekers requires a building permit.

Considerations

The appeal in public law matters is admissible (Art. 82 lit. a, Art. 83, Art. 86 para. 1 lit. d FSCA). Due to the spatial proximity of about 120 metres and the shared access road, the appellants are entitled to appeal as neighbours in the building law sense and may raise all objections concerning the building permit requirement. For complaints of violation of fundamental rights, including arbitrariness (Art. 9 Cst.), a qualified duty to raise objections applies (Art. 106 para. 2 FSCA).

The complaint of violation of the right to be heard (Art. 29 para. 2 Cst.) based on the rejection of evidentiary requests (site inspection, production of the operating permit and building application files) is rejected. In anticipatory assessment of evidence, the court may dispense with further evidence if it can assume without arbitrariness that such evidence would not change its conviction. The factual situation was documented in detail, and the lower court set out its reasoning at length.

Under Art. 22 para. 1 SPA, in principle even pure changes of use are subject to the building permit requirement. An exception applies only if the new use conforms to the zoning and the effects on the environment and planning are minor. Cantonal law (Art. 1a, 1b BauG/BE, Art. 6 BewD/BE) essentially corresponds to these requirements.

On zoning conformity: The development regulations (Art. 4 and 5) permit the holiday home and additionally refer to residential zone W3. The lower court interpreted the provision to mean that accommodation of persons particularly in need of protection and care is permissible, which corresponds to its purpose and is defensible. The municipality, as the legislative authority, has a margin of assessment which it has not exceeded. The interpretation is consistent with practice (judgment 1C_40/2010) and with legal doctrine. An arbitrariness complaint fails.

On the effects: The increase of ten beds (from a maximum of 90 to 100 beds; the…