Facts

Subject: concession for the use of hydraulic resources; public law appeal against the judgment of the Cantonal Court of the canton of Valais, Public Law Division, of 21 August 2015.

Parties: the appellants are WWF Switzerland, WWF Valais (cantonal section) and Pro Natura - Swiss League for the Protection of Nature, all three represented by a lawyer. The respondent is Forces Motrices Valaisannes SA (FMV SA). The Council of State of the canton of Valais, the Cantonal Court and the federal offices (SFOE, FOEN, ARE) participate in the proceedings.

Background: between La Souste and Chippis, the Rhône has been operated for more than a century for hydroelectric production. A dam at La Souste captures up to 65 m3/s, the water being conveyed by an open-air canal crossing the Bois de Finges, then by a tunnel to the Chippis power station. The average annual production is approximately 235 GWh. The installation is located within object No. 1716 of the federal inventory of sites and natural monuments of national importance (IFP), and object No. 133 of the federal inventory of alluvial zones is located directly downstream of the water intake.

History: the initial concession, which expired on 20 April 2004, was not renewed. The canton became owner of the installation by reversion right. Provisional measures were granted to FMV SA (21 April 2004, then extended until 31 December 2014), accompanied by a residual flow and a scientific monitoring programme (SSRF). On 30 April 2012, FMV SA applied for a new 80-year concession covering the existing installations. Five objections were filed, including those of the appellants.

Decision of the Council of State (18 June 2014): dismissal of the objections and grant of the 80-year concession as of 22 April 2004, ratified by the Grand Council on 9 September 2014. The main conditions are: a residual flow of 3.25 m3/s from June to February, 4.00 m3/s in March and 6.00 m3/s in April and May, which may be increased according to the SSRF results expected for autumn 2015; implementation of the EIA measures and supplementary reports; start of works within three years; creation and maintenance of artificial side channels; crossing structures and covering of the Finges canal; prohibition of drying out the section of the Rhône; installation of a fish pass.

Cantonal judgment (21 August 2015): very partial admission of the associations' appeals. The Cantonal Court invited the Council of State to supplement the file on the compensation and landscape preservation measures linked to the supply canal, and ordered the concessionaire to bear the replacement of the fish farming installation. For the rest, the decision was upheld.

Submissions before the Federal Supreme Court: the appellants request the annulment of the cantonal judgment and of the concession. In the alternative, they request a concession term limited to 25 years and a minimum residual flow of at least 30 m3/s (or one third of the natural flow, with a minimum of 10 m3/s at all times). FMV SA requests dismissal. The Council of State proposes dismissal to the extent that the appeal is admissible. The SFOE considers the project to be of national importance. The FOEN confirms this importance but points out a negative ecological balance of the compensation measures and an insufficient residual flow at certain periods. The final SSRF report of October 2015 was produced during the proceedings.

Main issue: the admissibility of an appeal against an interlocutory decision of remittal, the possibility of waiving a special planning procedure (Art. 2 and 14 SPA), the sufficiently precise nature of the compensation measures and of the fish pass, and the setting of the minimum residual flow on the basis of still incomplete data.

Considerations

1. Admissibility. The cantonal judgment, which remits the case to the lower authority, constitutes an interlocutory decision. The appeal is admissible only if the conditions of Art. 93 para. 1 let. a or b FSCA are met. The condition of let. b is not satisfied, as it has not been established that the remittal procedure would be lengthy and costly. The Federal Supreme Court nevertheless admits, on an exceptional basis, entry into the merits of appeals concerning large-scale infrastructure involving multiple public interests, where examination of the complaints may advance the procedure and avoid a violation of Art. 29 para. 1 Cst. (effective legal protection, reasonable time limit). The proceedings began in 2004 and cannot be concluded for a long time, so the appeal is admissible. The standing of WWF Switzerland and Pro Natura is recognised under Art. 55 EPA and Art. 12 NCHA, the work being subject to an environmental impact assessment and located in a landscape site and a biotope of national importance.

2. Establishment of the facts. The complaints concerning the presence of amphibian sites and dry grasslands are rejected. These sites are located at the edge of the valley, far from the riverbed, and are not manifestly affected by the water regime or by the installations. The criticism, insufficiently substantiated, does not satisfy the requirements of Art. 97 para. 1 FSCA.

3. Obligation to plan land use. The appellants invoke Art. 75 Cst. and Art. 2 EPA, in the absence of a special plan for the canal and the fish pass. The Federal Supreme Court recalls that installations subject to an environmental impact assessment or having a significant spatial impact must in principle be the subject of a zoning plan. At the expiry of a concession, the conditions must be fully re-examined, the concession not conferring any acquired right beyond its term. In this case, the installations exist and have been used for a long time; their spatial impact is therefore already determined, and it is no longer a question of choosing a route but of deciding on the continuation of operation. An overall weighing of interests, imposed by several laws (WPA, WRA, FishA, SPA, ordinances on alluvial zones and the IFP inventory), is in any event necessary. The prior existence of the installations must be taken into account in this weighing. The Cantonal Court further noted that municipal planning had to be adapted (Art. 35 para. 1 SPA). A special planning procedure may therefore be waived.

4. Compensation measures. Under Art. 54 let. d WRA, the concession must set out the conditions arising from other federal laws, in particular Art. 3 NCHA, Art. 6 NCHA and Art. 18 para. 1ter NCHA. According to case law, the NCHA measures must be examined from the first stage of the environmental impact assessment and described with precision in the decision. The decision refers to the EIA, whose measures form an integral part of the obligations. The criticisms relating to the Finges canal are irrelevant, as the Cantonal Court referred this question back to the first-instance authority. The feasibility of the revitalisations is ensured, since expropriation remains possible as a last resort (Art. 36 WRA/VS). However, the description of the side channels is insufficient: the decision must be supplemented as to their frequency and extent, the SSRF report not having the value of a decision. Pumping from Pumpensee 1 is not excluded by the concession, although it could compromise the downstream measures; it must be defined whether, and under which conditions, it would be permissible. The residual flow of the Rottensand bisse must also form an integral part of the decision and not be deferred. On the other hand, the fact that the concessionaire does not itself carry out certain measures but only bears their costs is not contrary to the causation principle nor to Art. 18 para. 1ter NCHA; the causation principle determines who pays, not who acts.

5. Fish pass. Under Art. 9 para. 1 let. b FishA, the authorities must impose measures ensuring the free migration of fish. The EIA sufficiently describes the footprint, dimensions, flow and technology of the pass, as well as the outline diagram of the downstream passage…