Facts

KW Breithorn Fafleralp AG (respondent) intends to build a run-of-river power plant with an installed capacity of 1.7 MW on the municipal territory of Blatten in the Lötschental. Water is to be diverted from the Inner Talbach at 2'025 m a.s.l. and conveyed through a pressure pipeline to a power station at 1'780 m a.s.l. The expansion water quantity amounts to 900 l/s, the gross head to approximately 245 m. No electricity is produced from mid-December to mid-March. The average annual production amounts to 5 GWh, the investment costs to CHF 7 million.

The Municipal Council of Blatten granted the water rights concession on 9 June 2011, and the Community Assembly approved the project on 20 June 2011. The Council of State of the Canton of Valais approved the concession on 27 August 2014 subject to conditions and dismissed the objections. The environmental organisations WWF Switzerland, WWF Oberwallis, Pro Natura Switzerland, Pro Natura Oberwallis and Swiss Foundation for Landscape Conservation (appellants) filed an administrative law appeal. The Cantonal Court of Valais dismissed the appeal by decision of 28 May 2015.

By public law appeal of 2 July 2015, the organisations requested that the cantonal decision be set aside, alternatively that the matter be remitted. The Cantonal Court and the Municipality of Blatten requested dismissal, as did the respondent and the Council of State. The FOEN considered the power plant eligible for approval.

Subject matter of the dispute: Water rights concession; environmental protection. The main question is whether the encroachment on the BLN object No. 1706 (Bernese High Alps and Aletsch-Bietschhorn area, southern part) and on the UNESCO World Heritage Site 'Swiss Alps Jungfrau-Aletsch' is minor or severe, and whether the balancing of interests was carried out in accordance with federal law under WPA and WRA.

Considerations

The Federal Supreme Court entered into the appeal. It concerns a public law matter (Art. 82 lit. a FSCA). The organisations are nationwide environmental organisations and are entitled to appeal under Art. 12 NCHA, as the association right of appeal under Art. 55 EPA does not apply due to the installed capacity below 3 MW.

The court rejected a violation of the right to be heard through the waiver of an on-site inspection. The files, including photographs and detailed information on nature, landscape and residual water flow, allowed a decision without an on-site inspection; for the same reason, the request for an on-site inspection was rejected by the Federal Supreme Court.

Under Art. 29 lit. a, 30 lit. a, 31 and 33 WPA as well as Art. 22 WRA, a balancing of interests between water abstraction and landscape conservation must be carried out. For BLN objects, qualified protection provisions apply under Art. 6 NCHA: a severe encroachment is in principle inadmissible in the performance of a federal task, while a minor encroachment permits a balancing of interests. The opinion of the FCNP carries great weight and may only be departed from for compelling reasons. The power plant has no national interest value, as its contribution to nationwide energy production is small.

The FCNP specified the protection objective of BLN object No. 1706 on the basis of objective criteria, including the natural water dynamics of the Inner Talbach as a defining landscape element. The Federal Supreme Court adopted this specification, which also corresponds to the FOEN draft for the total revision of the BLN. The project therefore affects the protected object, and it must be examined whether the impact is minor or severe.

The FCNP had assessed the original project with 1.2 m3/s as severe. After the reduction to 900 l/s and a residual water regime with approximately 58% remaining outflow on annual average, the FCNP classified the project as a borderline case between minor and severe impact. It applied the FOEN module-level concept HYDMOD-F (class 2 'slightly altered'). The 55% target value is not a statutory requirement but an auxiliary tool; consideration of spring water inflows and of the absolute residual water quantity is not objectionable. The shortfall in September (47.6%) is not seriously significant in absolute terms at an average flow of 702 l/s. The rejection of the request for an expert opinion on spring water inflows and the reliance on the measurement of 1 February 2011 as well as extrapolations were not arbitrary and did not violate the right to be heard.

The…