Facts
On 16 March 2010 the Municipal Council of Affoltern am Albis resolved a road construction project involving the new construction of the bus stop 'Weinberg' as a carriageway stop on Mühlebergstrasse, a pedestrian crossing with a central island and an adjustment of the lighting. The stop was planned uphill at the level of Wilgibelweg and of the property Cadastral No. 3752, which is owned by the appellant [A.] . For the widening of the carriageway in favour of the pedestrian crossing, 108 m2 of this parcel were to be acquired. Opposite, about 60 m to the north-west, there is already a downhill stop 'Weinberg'.
The appellant lodged an objection, which the Cantonal Department of Construction of the Canton of Zurich rejected by decision of 16 July 2014, insofar as it was admissible. The Department of Construction fixed the project and approved the net expenditure. The Construction Appeals Court of the Canton of Zurich dismissed the appeal on 20 January 2015, insofar as it was admissible. The Administrative Court of the Canton of Zurich, 3rd Division, 3rd Chamber, dismissed the appeal by judgment of 10 June 2015.
The appellant brought a public law appeal before the Federal Supreme Court. He requested the annulment of the judgment of the lower court and of the decision of 16 July 2014, as well as the waiver of the stop and the central island on his property. In the alternative, he requested a minimal solution without the central island, with relocation of the road onto his property and access via the stop, or alternatively the selection of the site 'Haselächer'. He further requested approval of access for two single-family houses. The Administrative Court requested dismissal; the lower instances or authorities expressed themselves only to a limited extent.
In dispute are in particular the proportionality of the interference with land ownership (Art. 36 FC), the access to the property, the public interest in the stop, and an alleged inequality of law compared with the stop 'Kronenplatz'.
Considerations
The public law appeal against the final cantonal decision in building and planning law is admissible (Art. 82 ff. FSCA, BGE 133 II 353). The appellant, as owner of the affected parcel, has standing to appeal (Art. 89 para. 1 FSCA). Complaints may be raised concerning violation of federal law, international law and cantonal constitutional rights (Art. 95 FSCA). Violation of cantonal law may only be raised indirectly through the prohibition of arbitrariness; arbitrariness exists where a decision is manifestly untenable (BGE 138 I 143). The Federal Supreme Court examines alleged violations of fundamental rights only insofar as they have been clearly and precisely raised (Art. 106 para. 2 FSCA).
As to the alleged refusal of information on buildability (right to be heard): the appellant does not explain on which provision he bases a right to information before the initiation of building permit proceedings. The complaint is doubtfully substantiated, but may be left open, since the Traffic Office, the Department of Construction and the Administrative Court have expressed themselves on access. Information provided within preliminary enquiries is generally not binding in the subsequent building permit proceedings. The auxiliary request concerning approval of access for two single-family houses is therefore inadmissible, as no building permit proceedings are pending.
The expropriation-law requests (compensation for diminution in value) must be asserted in the valuation proceedings; the Administrative Court did not enter into them, and the appellant has not challenged this consideration. The corresponding request is therefore inadmissible.
On proportionality (Art. 36 paras. 1-3 FC): restrictions of fundamental rights require a legal basis, a public interest, and must be suitable, necessary and reasonable (BGE 140 I 2). Based on the Road Act, the Administrative Court affirmed a legal basis and a public interest in improving public transport access to the Sonnenberg/Weinberg area, as the terrain is steep and there is a gap between the stops 'Stigeli' and 'Lilienberg'. The alternative site 'Haselächer' proposed by the appellant is too far away for residents west of Mühlebergstrasse; for residents east of it, the planned stop would also be closer. The lower court could therefore assume without arbitrariness that the alternative site is less suitable. The necessity requirement is thus met.
As to access to the property: the bus stop does not render building impossible but restricts it. According…