Facts
The appellant, a public limited company (AG), owns parcel No. 4169 in Worb, located in residential zone W2, where a furniture workshop and joinery has been operated since 1944. After a fire in 1999, the Einwohnergemeinde Worb approved the reconstruction. In January 2010 two further companies (X. and [Y. GmbH]) moved into the building; in spring 2010 a new chip extraction system was installed and machines were replaced. The business changed into a joinery focused mainly on construction joinery work, with three owners, eight employees, four delivery vans and eight to nine passenger cars.
Following a complaint by neighbours, the Regierungsstatthalteramt determined on 15 December 2010 that the intensified use and the structural measures required a building permit. On 20 May 2011 the municipality granted a subsequent building permit. The ACI partially set aside this decision on 29 February 2012 and remitted the matter to the municipality for restoration; the Administrative Court of the Canton of Bern dismissed the appeal on 2 April 2013.
By decision of 22 November 2013, the municipality approved the construction project subject to conditions (overall building decision) and ordered restoration measures, including, under lit. e, a maximum of eight persons working at the site, lorry quotas, operating hours from Monday to Friday, and parking rules. By decision of 5 June 2014, the ACI reduced the maximum number to five persons (including the business owners), with an obligation to report names and registration plates, and amended further provisions. The Administrative Court joined the proceedings and dismissed the appeals of both parties by judgment of 19 August 2015.
Before the Federal Supreme Court, the appellant primarily requests a maximum of eight persons, in the alternative five private vehicles instead of a number of persons, and in the further alternative remittal. She alleges a violation of the guarantee of property (Art. 26 Cst.) and of economic freedom (Art. 27 Cst.) on the ground of disproportionality. The lower instances and the respondents request dismissal. The Federal Supreme Court granted suspensive effect to the appeal.
The essential issues are whether the restriction to five persons working simultaneously at the site is proportionate, and whether the level of employment (part-time) was sufficiently taken into account. The scope of the guarantee of acquired rights (three to five persons, five vehicles) was not disputed.
Considerations
The Federal Supreme Court has jurisdiction, as this is a final cantonal decision on building and planning restoration measures (Art. 82 ff. FSCA). The appellant is legitimised as an addressee under Art. 89 para. 1 FSCA. The statutory basis is Art. 46 BauG/BE; restoration measures must be proportionate under Art. 36 para. 3 Cst., both with regard to the guarantee of property and economic freedom.
A restoration order is disproportionate if the deviation from the law is minor and the public interests do not justify the harm to the owner. A builder who is not in good faith may also invoke proportionality, but must accept that the authorities, for reasons of equal treatment and orderly construction, give increased weight to the interest in restoration (BGE 132 II 21). The lower court weighed the appellant's bad faith as slight, since the requirement for a permit in the case of intensified use is less obvious than in the case of structural measures.
According to the Federal Supreme Court, the appellant was not in good faith: at the very least, doubts should have arisen, and she should have enquired with the building authorities; this is negligence that excludes good faith. The preliminary assessment of the building department of 26 April 2010 was subject to the reservation of further investigations, and the question was in any event submitted to the Regierungsstatthalteramt.
The restriction on the number of persons working simultaneously at the site is suitable for reducing the operating capacity and the emissions incompatible with the zone, in particular the morning loading and preparation traffic. Since delivery van traffic is not subject to a quota, the restriction on persons has an effect. Equally suitable milder measures, in particular temporal operating rules, are not apparent. The obligation to report the names of persons working at the site is also necessary as a control measure. Limiting the number to private vehicles, by contrast, is not mandatory, since it would have no effect on the emissions of the business and would only affect the number of trips.
It is not comprehensible, however, why the level of employment was not taken into account. What is decisive is solely that no more persons than permitted are…