Facts
By judgment of 17 March 2022 (1C_53/2021), the First Public Law Division of the Federal Supreme Court rules on a public law appeal against the judgment of the Vaud Cantonal Court, Administrative and Public Law Division (CDAP), of 11 December 2020 (AC.2018.0196, AC.2020.0038).
Subject matter: building permit for the "Centre scolaire intercommunal Le Bix" in Arzier-Le Muids.
Factual background
- On 24 November 2017, the Municipality of Arzier-Le Muids put to public inquiry a project comprising 14 classrooms, a triple gymnasium and an UAPE, on parcels nos 808 and 810 (total area of 12'348 m²), in a zone of public utility under the 1985 general zoning plan, except for a 303 m² portion of parcel no. 808 located in the agricultural zone.
- The site is located at the north-eastern end of the village, bordered by cantonal road no. 24 C-P and Chemin de la Grange. The Ruisseau du Bix crosses parcel no. 808. The car park (77 spaces) is planned upstream of the stream, accessible from the cantonal road.
- Several neighbours lodged objections. On 7 and 8 May 2018, the municipality granted the building permit and dismissed the objections. The objectors brought proceedings before the CDAP, in particular for insufficient access and for access to the car park crossing the agricultural zone. The proceedings were suspended at the request of the municipality.
- In May 2019, the municipality put to public inquiry a road project (T-junction with left-turn pre-selection, widening of the carriageway, reduction of speed from 80 to 50 km/h, expropriations). The communal council adopted it on 18 November 2019. On 23 December 2019, the Cantonal Department of Infrastructure and Human Resources (DIRH) preliminarily approved the road project and dismissed the objections. A new appeal was lodged with the CDAP.
- During the proceedings, a supplementary inquiry concerned the car park and outdoor facilities. The supplementary permit was granted on 15 October 2020 and was also appealed.
Cantonal decision
By judgment of 11 December 2020, the CDAP joined the cases and dismissed the appeals. It held in particular that: the devolutive effect does not preclude a modification of the project until the close of the investigation; the project complies with the zone of public utility; the permit and the road project are coordinated; the 303 m² portion is incorporated into the public domain, so that Art. 24 SPA is no longer applicable, this change being planned from the outset; access via the cantonal road, the junction and the car park capacity (VSS standard) are satisfactory; pedestrian safety is ensured subject to arrangements; the 0.8 m derogation from the regulatory height is justified by a public interest; aesthetics and integration are respected.
Proceedings before the Federal Supreme Court
The appellants (neighbouring owners and co-heirs, represented by counsel) request annulment of the contested decisions if their nullity is not established. Suspensive effect was granted on 22 February 2021. The municipality concludes that the appeal be dismissed. The cantonal authorities waived submissions, and the Federal Office for Spatial Development did not submit any.
Considerations
Admissibility. The appeal is directed against a final decision (Art. 90 FSCA) rendered in last cantonal instance (Art. 86 para. 1 let. d FSCA) in the field of public law on spatial planning and construction (Art. 82 let. a FSCA). Some appellants did not challenge the initial permit, which limits their standing to appeal, and some live at a distance from the project. The question may nevertheless be left open, as some appellants are direct neighbours with a personal interest deserving protection within the meaning of Art. 89 para. 1 FSCA.
Establishment of the facts (Arts. 105 and 97 FSCA). The appellants allege a manifestly incorrect establishment of the facts. The Federal Supreme Court holds that the change of status of the 303 m² portion was planned from the outset, which is not arbitrary, since this portion adjoins the road and is to serve for access. The assertion regarding accessibility on foot concerns the application of law (measure B41 of the cantonal structure plan, which does not cover primary schools) and not the establishment of the facts. The maintenance of access, the absence of cycle facilities and the earthworks result from the file and are not disputed by the contested judgment. The complaint is dismissed.
Formal denial of justice (Art. 29 para. 2 Cst.). The complaint concerning the earthworks was examined from the angle of Art. 86 LATC (aesthetics and integration), so that the cantonal court responded sufficiently. The complaint based on road noise and NAO was not raised in the cantonal appeal or in the reply, and the inspection report contains no reservation; there is therefore no denial of justice. These complaints are dismissed.
Special planning (Art. 2 SPA). Federal law requires special planning for projects not conforming to the zone, or for installations conforming to the zone but having a territorial impact such that planning is necessary (impact study, large footprint, significant increase in traffic). The project conforms to the zone of public utility and its spatial impact is not major (site in continuation of a built-up zone, traffic of approximately 365 vehicles per day absorbed by the existing network, NAO limit values complied with, reserved space for waters respected). No obligation to plan exists.
Circumvention of Art. 24 SPA and nullity of the permit. Circumvention presupposes the creation of small isolated building zones (Art. 15 SPA). The incorporation of a portion into the public domain for a road or an access does not fall within this category. Given the small size of the portion and its logical connection to the road access, the derogatory authorisation was not necessary and the validity of the permit is not called into question. The complaint is unfounded.
Facilities and access (Art. 19 SPA). An access route is adequate where it is technically and legally sufficient and the safety of users is guaranteed, without…