Parties and Proceedings: The appellant is the owner of plot No. 363 in the municipality of Eggersriet (SG). He files two appeals in public law matters with subsidiary constitutional complaint. Proceeding 1C_47/2019 is directed against the decision of the Administrative Court of the Canton of St. Gallen of 13 December 2018 (B 2017/185). Proceeding 1C_95/2019 is directed against the judgment of the Higher Court of the Canton of Appenzell Ausserrhoden of 20 December 2018 (O4V 17 28). The co-parties are the Political Municipalities of Eggersriet and Grub, as well as the Building Department of the Canton of St. Gallen and the Department of Construction and Economy of the Canton of Appenzell A.Rh. and the Government Council of Appenzell A.Rh. The municipality of Grub is represented by the same attorney.
Facts: In the Riemen area (GWF Riemen, plot No. 426) and in the Halten area (GWF Halten, plot No. 427) of the municipality of Grub, there are groundwater abstraction facilities in the valley floor. Both parcels belong to the municipality of Grub, which operates the municipal water supply and the water extraction. The catchment area lies in the territory of Grub and Eggersriet. South of the facilities there was a shooting range, which has since been decommissioned and dismantled (demolition of the shooting clubhouse in 2010, removal of the bullet trap in 2015). In the mid-1990s a draft delimitation plan and protection zone regulation was submitted, but no legally binding designation took place. In 1994 a groundwater protection zone was provisionally established. From 2009 onward the work was resumed. Protection zones for GWF Riemen and a groundwater protection area for GWF Halten were planned.
Procedural History: On 20 April 2015 the Municipal Council of Eggersriet issued the delimitation plan and protection zone regulation, and the Municipal Council of Grub approved the documents on 15 April 2015. Public inspection took place from 4 May to 2 June 2015. The appellant filed an objection. In the first round, the Municipal Council of Eggersriet revoked its decision on the objection upon the appeal of the municipality of Grub. The Department of Construction and Economy of Appenzell A.Rh. rejected the objection for the area of Grub on 16 August 2016. In the second round, the Municipal Council of Eggersriet upheld the objection for its area and waived the issuance of the plans. The Building Department of St. Gallen upheld the appeal of the municipality of Grub on 29 August 2017. The Government Council of Appenzell A.Rh. rejected the appellant's appeal on 22 August 2017. The Administrative Court of St. Gallen and the Higher Court of Appenzell A.Rh. dismissed the appellant's complaints. The President of the I. Public Law Division rejected the request for suspensive effect.
Requests: The appellant requests the annulment of the contested decisions and the confirmation of the objection decision of the Municipal Council of Eggersriet. In proceeding 1C_95/2019 he essentially requests the waiver of the designation of a groundwater protection area around GWF Halten. The lower courts and the municipality of Grub request dismissal. The FOEN commented from an environmental law perspective. The Federal Supreme Court obtained from the Department of Construction and Economy of Appenzell A.Rh. a report on foreign substances from firearms ammunition (in particular arsenic and antimony), which was issued on 20 May 2020.
Subject of the Dispute: The central questions are the legal nature of the designation of groundwater protection zones and areas (spatial planning or water protection administrative decision), the admissibility of the appeal, the coordination between the cantons, the public interest in GWF Halten (yield, water quality, chloride, road runoff, legacy contamination from shooting operations) and the proportionality of the interference with property.
Considerations
Joinder of Proceedings and Admissibility: Proceedings 1C_47/2019 and 1C_95/2019 concern the same groundwater abstraction facilities and essentially the same legal questions. They are therefore joined (Art. 71 FSCA in conjunction with Art. 24 FCPA). The contested decisions originate from the last-instance cantonal courts (Art. 86 para. 1 lit. d FSCA). The designation of groundwater protection zones (Art. 20 WPA) and areas (Art. 21 WPA) is a public law matter without any ground of exclusion under Art. 83 FSCA; the appeal in public law matters is therefore open (Art. 82 lit. a FSCA). There is no room for a subsidiary constitutional complaint (Art. 113 FSCA).
Legal Nature of the Determination: Under federal law, the cantons may subject the delimitation of groundwater protection zones and areas to the spatial planning procedure or create a separate procedure. In the second case, it is a water protection administrative decision and not a planning measure under SPA, although it may justify an amendment of the zoning plan. Approval under Art. 26 Cst. is only required if the determination under cantonal law takes the form of spatial planning. The case law in BGE 121 II 39 and BGE 120 Ib 287 concerns spatial planning procedures and cannot be transferred to all procedures. The cantonal laws (Art. 29, 31, 32 GSchVG/SG; Art. 71 UGsG/AR) do not prescribe the designation as spatial planning. The cantonal departments implicitly ordered the zone determination as a remedial or objection authority. The contested decisions are therefore final decisions within the meaning of Art. 90 FSCA. The appellant, as a landowner subject to restrictions on property (protection zones S2 and S3 or areas SA2 and SA3), has standing under Art. 89 para. 1 FSCA.
Complaints Not Entered Upon: The complaints concerning compensation under Art. 20 para. 2 and Art. 21 para. 2 WPA (Art. 68 WPA) are not addressed. The cantonal procedure for compensation is governed by cantonal law, the subject matter of the dispute was limited to the designation, and the appellant did not substantiate the federal law unlawfulness of the delimitation. The objections of bias raised by the Municipal Council of Eggersriet were first brought up in the reply and are untimely (Art. 42 FSCA; BGE 143 II 283).
Coordination Requirement: Coordination between the cantons follows from Art. 46 para. 2 lit. a WPA, Art. 46 para. 1 WPO and Art. 56 ORP. Since the cantons do not provide for joint competence, the separate competence for the respective territory remains. The coordination requirement is met when the authorities issue separate but temporally and substantively coordinated decisions (cf. BGE 116 Ib 50). According to the view of the Administrative Court, the St. Gallen Building Department was entitled to decide on the merits directly in the appeal procedure (Art. 46 and 56 ORP/SG); this is not contrary to federal law. The submission was coordinated and publicly displayed, and the appellant was able to challenge the decisions in an overall assessment. Involving the FOEN was not required. Formal and substantive coordination is therefore maintained.
Public Interest and Requirements: Planning-based water protection restricts property and requires a legal basis, a public interest and proportionality (Art. 26 in conjunction with Art. 36 Cst.). The protection zones S1 to S3 (Art. 20 WPA, Annex 4 No. 121 WPO) and the areas (Art. 21 WPA, Annex 4 No. 13 WPO) serve to secure drinking water supply, whereby areas keep land free for future use. Groundwater is usable if it is sufficient in quantity and qualitatively meets the requirements of food legislation or can meet them after simple treatment (Annex 4 No. 111 WPO). Temporary burdens are disregarded. A protection zone is generally justified precisely in the case of potential sources of contamination. A water…