Facts
The construction company [G.] (respondent) intended on 22 December 2016 to build a cinema centre with eight screens and 1'390 seats, with ancillary uses (shop area, restaurant, bar, event room, mini-golf facility), an underground garage with 154 parking spaces, and a pedestrian footbridge into the existing shopping and commercial centre [G.] (EGC) across the railway tracks of the Rhaetian Railway. The total floor area is 13'367 m2.
Of the 154 parking spaces, 35 are agreed to be shared with the existing multi-storey car park of the EGC (681 parking bays); the remaining 119 parking spaces are provided in the new building. Both plots are owned by the respondent.
The building application was publicly displayed from 6 to 26 January 2017. The environmental report by Tuffli & Partner AG dated 22 December 2016, attached to the application, denied the EIA obligation because there was only a minor functional connection. The cantonal Office for Nature and Environment (ANU/GR), by contrast, affirmed the EIA obligation but considered the cinema centre to be a single installation. The City of Chur (building authority) approved the project on 1 June 2017 subject to conditions; the objection of the appellants, neighbours, was dismissed insofar as it was admissible.
The Administrative Court of the Canton of Graubünden partially upheld the appeal on 10 April 2018, inserting a condition requiring that the 35 parking spaces be shared with cinema visitors during peak times, and otherwise dismissed it. The appellants lodged a public law appeal with the Federal Supreme Court and requested the annulment of the lower court's judgment. The FOEN filed an opinion without a motion. The main question was whether an overall installation within the meaning of Art. 8 EPA exists which is subject as a whole to the EIA.
Considerations
The public law appeal is admissible. The appellants, as neighbours in the building law sense, have standing to appeal (Art. 89 para. 1 FSCA). The complaint regarding the scope of the EIA, in particular the existence of an overall installation, is a question of law and, as a new legal argument, is not caught by the prohibition on novel arguments (Art. 99 FSCA). The complaint of a breach of the duty to give reasons under Art. 29 para. 2 Cst., however, is rejected, since the lower court adequately addressed the traffic complaints.
Under Art. 8 EPA, emissions must be assessed individually and collectively as well as according to their interaction. According to case law (BGE 142 II 20), an operational unit forms an overall installation where, in addition to spatial proximity, there is a close functional connection, i.e. an interaction going beyond what the authorities require. Where there are different building owners, at least a common organisation or purpose is required; where the owner or operator is the same, lower requirements apply. Common official requirements are not sufficient.
In the present case, spatial proximity is undisputed. A decisive functional connection is to be affirmed: the respondent is owner of both plots and part of the building owner, the footbridge allows circulation between the complementary offerings, the shared use of the 35 parking spaces rests on an exemption permit granted upon request under Art. 7 of the Chur Parking Regulation and not on an official requirement, and the heat is to be drawn from the combined heat and power plant of the EGC. The common name and the impression it creates of a single shopping and leisure centre also support this. The absence of joint marketing is not decisive given that the cinema centre has not yet been built.
The assessment in the environmental report, by the ANU/GR and by the FOEN, that the parking facility of the cinema centre is to be assessed as a single installation therefore violates Art. 8 EPA; a joint assessment as an overall installation was required. Furthermore, the FOEN's denial of a material change to the shopping centre under Art. 8 EPA is not consistent with its own guidelines, according to which extensions of more than 100 parking spaces are regularly material.
Procedurally, Art. 55a EPA and Art. 45…