Facts

The [C. AG] and the [D. AG] (building applicants) planned to construct on plot No. 22 in Freidorf (municipality of Roggwil TG) four multi-family buildings with a total of 20 apartments, two commercial units and an underground garage. The property (area 24'000 m2, partial area for the project 5'221 m2) is owned by Schweizerische Südostbahn AG (SOB). During the public display from 23 February to 15 March 2015, several objections were filed, including those of [B.] and [A.] (appellants). The projects were modified twice. The municipality of Roggwil dismissed the objections by decisions of 16 and 31 December 2015 and granted the building permit. The Department of Construction and Environment of the Canton of Thurgau (DBU) dismissed the appeals by decision of 7 November 2016. The Administrative Court of the Canton of Thurgau dismissed the appeal by decision of 9 August 2017 (GLA.2016.168/E), but included in the operative part a condition concerning the outdoor parking spaces.

Before the Federal Supreme Court, the appellants requested the annulment of the decisions of the Administrative Court, the DBU and the municipality and the refusal of the building permit. The DBU and the Administrative Court requested dismissal, as did the respondents to the appeal. The municipal council waived its statement of position. By presidential order of 6 November 2017, suspensive effect was granted to the appeal.

Points in dispute: (1) recusal of the municipal president and duty to state reasons; (2) relevant terrain for building and ridge height under § 8 aPBV, after the terrain had been filled in 1911 for railway construction; (3) compliance with the floor space ratio and cost consequences in connection with a planned subdivision; (4) sufficient development; (5) condition concerning the visibility strip and failure to notify the landowner.

Considerations

The appeal is admissible: it concerns a final cantonal decision in public-law matters (Art. 82 lit. a and Art. 86 para. 1 lit. d FSCA). The appellants, as owners of a neighbouring plot separated by a road and as parties to the proceedings, have standing to appeal (Art. 89 para. 1 FSCA). The request to also annul the decisions of the DBU and the municipality is inadmissible, as these were replaced by the decision of the Administrative Court (devolutive effect, BGE 134 II 142 E. 1.4).

Recusal: Based on Art. 29 Cst., every party to proceedings is entitled to a properly constituted authority (BGE 140 I 326 E. 5). It is undisputed that the municipal president did not take part in the decision on the permit and on the objections, which corresponded to the appellants' request. Art. 29 Cst. does not necessarily require a separate interlocutory decision; implementation follows the applicable procedural law, the violation of which was not complained of (Art. 42 para. 2 and Art. 106 para. 2 FSCA). The complaint of an arbitrary establishment of facts is unfounded, as the minute note does not show that the municipal president had dealt with the matter before 16 December 2015. The factual complaints concerning the 'voluntary' nature of the recusal and the duty to state reasons (Art. 29 para. 2 Cst.) were not considered for lack of sufficient substantiation (Art. 97 para. 1, Art. 106 para. 2 FSCA).

Relevant terrain: Under § 8 para. 1 aPBV, the natural terrain is generally the starting point. The Administrative Court relied on the terrain, which was designed in a permissible manner and refers to the topography of the immediate surroundings (railway area, roads, agricultural land), and rejected circumvention through 'salami tactics' or 'molehills'. The Federal Supreme Court holds that the duty to state reasons is satisfied, since not every submission must be expressly refuted (BGE 140 II 262 E. 6.2). According to judgment 1P.138/2003, the rule-exception relationship must be preserved, within which the cantonal authorities have considerable discretion. The legal basis for the filling (cantonal building law or railway legislation) is secondary; what is decisive is that the rule-exception relationship is not reversed, which is not apparent with terrain design unchanged for over a hundred years. The assessment that the change in terrain is not conspicuous due to its extent and the gentle transitions is not arbitrary. A violation of Art. 3 para. 2 lit. b or Art. 22 para. 2 lit. b SPA is not apparent.

Floor space ratio: The planned subdivision and transfer of use are not the subject of the proceedings. What is decisive is that the floor space ratio is complied with on the currently undivided…