Facts

Company [B. SA] has operated since 1983 a site for recycling mineral construction waste on parcels Nos. 12'047, 12'048 and 13'461 in the municipality of Meyrin, along the Route du Nant-d'Avril. Parcels 12'047 and 12'048 have been zoned as an industrial and craft development zone since the adoption of Law 10'655 by the Grand Conseil on 24 September 2010 (ZIBAT). Parcel 13'461 was zoned as an industrial and craft development zone in 1969.

Company [A. SA] , the appellant, owns parcel No. 4'399 in the municipality of Vernier, located across the road, where it stores containers and operates offices and workshops employing 65 people.

By global decision of 21 November 2014, the Cantonal Department of the Environment, Transport and Agriculture (DETA) granted [B. SA] a building permit (issued on 11 November 2014 by the Department of Planning, Housing and Energy) for the redevelopment of the site, as well as an operating permit subject to various conditions. The project notably provides for a 73-tonne crusher with a throughput of up to 450 t/h, a loader, a hydraulic excavator, a haul road, storage areas, a settling basin and a wheel washer. The redevelopment aims to optimise traffic flows, reduce atmospheric nuisances and prevent water pollution.

The Administrative Tribunal of First Instance partially upheld [A. SA] 's appeal by judgment of 17 February 2016, limiting the duration of the permit to five years. The Administrative Chamber of the Court of Justice partially upheld the appeal by judgment of 22 August 2017 (ATA/1185/2017), amending point 8 of the operative part concerning the quantities of waste that may be stored simultaneously.

[A. SA] appeals to the Federal Supreme Court, seeking the annulment of the cantonal judgment and of the permits of 11 and 21 November 2014. DETA and [B. SA] request dismissal of the appeal. The Federal Office for the Environment (FOEN) raises a problem of compliance with the Ordinance on Air Pollution Control (OAPC) and considers that housing the installation, at least partially, under a hall would be the only measure enabling compliance with the statutory prevention requirements. By order of 17 November 2017, the President of the First Public Law Court rejected the application for suspensive effect.

Considerations

Admissibility: the appeal in public law matters is directed against a final decision of the last cantonal instance (art. 82 let. a, 86 para. 1 let. d and 90 FSCA). The appellant, owner of land in the immediate vicinity of the installation, is particularly affected and has a legitimate interest in the outcome. The appeal is admissible.

First complaint (building permit without an industrial or craft master plan): the violation of cantonal law is in principle not a ground for appeal (art. 95 let. c to e FSCA), unless the application of cantonal law violates a rule of federal law, in particular art. 9 Cst. (prohibition of arbitrariness). Complaints concerning cantonal law are subject to an enhanced duty of substantiation (art. 106 para. 2 FSCA). Geneva law (art. 12 para. 4 SPA-Law, art. 4 LZIAM) allows the Conseil d'Etat to authorise application of the rules of the development zone, subject to the prior approval of a master plan or a PLQ, or to the waiver of these in the cases provided for in art. 4 para. 3 LZIAM. The cantonal court considered that, as long as these conditions were not met, the rules of the primary zone remained applicable. The appellant does not demonstrate arbitrariness: the literal reading of art. 4 LZIAM and art. 12 para. 4 SPA-Law does not compel the thesis of an absolute primacy of the development zone; the provisions on reserved zones (art. 27 SPA) or on the refusal of projects compromising planning (art. 13B SPA-Law) do not point in that direction; judgment ATA/231/2014, confirmed by judgment 1C_276/2014, does not lay down a general rule and does not decide the question of the survival of the primary zone; lastly, the factual differences from the case law cited have not been shown to be decisive. The complaint is rejected.

Second complaint (review of the effectiveness of dust control measures, ch. 43 para. 1 Annex 1 OAPC): under art. 11 paras. 1 and 2 EPA, emissions must be limited at source to the extent permitted by the state of the art and operating conditions, provided this is economically viable. For phases generating heavy dust (crushing, grinding, loading), gaseous effluents must be captured and conveyed to a dust extraction installation (ch. 43 para. 1 Annex 1 OAPC; art. 6 para. 1 OAPC). The FOEN noted that the measures planned, notably humidification integrated into the crusher and spraying, do not make it possible to contain…