Facts

Subject matter: Quartier plan Derby in Davos; appeals against the judgment of the Administrative Court of the Canton of Graubünden, 5th Chamber, of 14 November 2017.

Parties: Appellant 1 is the condominium owners' association [A.] (proceeding 1C_695/2017); appellant 2 is [B.] (proceeding 1C_696/2017); appellants 3 are [C.] , [D.] , [E.] , [F.] , [G.] and [H. AG] (proceeding 1C_706/2017). Respondents are [I.] (owner of parcel No. 4872), [J. AG] (planner) and [K. SA] (owner of parcels Nos. 6305 and 695). Also involved are the Municipality of Davos and the Administrative Court of Graubünden.

Facts: The former Sanatorium Davos Dorf was converted after the First World War into the Sporthotel Derby with a park and garden area. The site lies in the Inner Centre Zone, overlaid with the Inner Centre Area. On behalf of [K.] , [J. AG] prepared a quartier plan which additionally covers parcel No. 4872. The second draft was publicly displayed on 7 June 2016 and is based on an indicative project; it defines building windows, perimeter lines and access.

Proceedings: Eight objections were filed against the draft. The Graubünden Civil Engineering Office indicated the necessary access permits. By decision of 13/16 December 2016, the Small Council of the Municipality of Davos essentially dismissed the objections and approved the quartier plan with amendments (Art. 4 para. 3, 7, 8, 11, 13 and 14 QPV; new Art. 23 QPV). The Administrative Court joined the appeals, conducted an inspection on site and upheld the appeals on one point only (Art. 8 para. 6 QPV), dismissing them otherwise. The appellants applied to the Federal Supreme Court for annulment of the decision and refusal of approval, alternatively remittal. The respondents, the municipality and the Administrative Court applied for dismissal. The ARE found the considerations on zoning dimensioning and the second-home law convincing; the FOEN found the judgment compliant with noise protection law.

Disputed points: (1) Voting-rights complaint of appellants 3 concerning implementation of the popular will of 2004; (2) duty to review the size of building zones under Art. 21 para. 2 SPA following the second-home initiative; (3) circumvention of the planning zone and the future municipal second-home law (Art. 27 SPA); (4) construction advisory under Art. 8 f. BauG/Davos and right to be heard; (5) utilisation bonus under Art. 121 BauG/Davos and quartier design plan under Art. 121a BauG/Davos; (6) noise protection: access (Art. 24 para. 2 EPA), road noise (Art. 22 EPA), underground car park (Art. 25 EPA); (7) further complaints concerning traffic, parking demand and sunlight (Art. 25 and 26 BauG/Davos).

Considerations

Admissibility: The public law appeal against the final cantonal decision is open (Art. 82 let. a, 86 para. 1 let. d, 90 FSCA). The appellants are particularly affected as owners of neighbouring properties and have standing (Art. 89 para. 1 FSCA). The three proceedings are joined, as the appeals are directed against the same judgment. The voting-rights complaint of appellants 3 is not admissible (Art. 82 let. c FSCA): they do not complain of defects in the 2004 vote, but of its implementation in the quartier plan. As the 2004 vote concerned an authority proposal (assignment to the Inner Centre Zone) and not a general suggestion, the complaint must be raised under building and planning law; prior assurances may be taken into account when interpreting zoning regulations or under liability based on legitimate expectations.

Scope of review: The Federal Supreme Court examines federal law ex officio (Art. 106 para. 1 FSCA). Violations of fundamental rights and arbitrariness in cantonal and municipal law are examined only where specifically raised (Art. 106 para. 2 FSCA). New facts and evidence are admissible only to a limited extent (Art. 99 para. 1 FSCA); reasons supplemented late remain disregarded (Art. 42 para. 1 FSCA). The established facts bind the court unless manifestly incorrect (Art. 105, 97 para. 1 FSCA).

Review of building zone size (Art. 21 para. 2 SPA): Following acceptance of the second-home initiative, a comprehensive review of building zones may be required under BGE 140 II 25 (Silvaplana); oversized building zones alone are not sufficient, but additional circumstances must exist that make a redimensioning realistic precisely in the area of the building parcels (BGE 144 II 41). In the present case, de-zoning is unrealistic given the central location in the village centre on the main traffic axis and the requirements of the SPA on inward development and compact settlements (Art. 1 para. 2 let. abis and b, Art. 3 para. 3 let. abis, Art. 8a para. 1 let. c SPA). Downzoning primarily concerns peripheral and outlying areas (Art. 15 para. 3 SPA). Therefore, the Administrative Court did not have to examine the modalities of the vacancy rate.

Planning zone and second homes (Art. 27 SPA): Circumvention or negative prejudice of the future municipal second-home law is excluded. The quartier plan contains no binding use regulations of its own, but refers in Art. 15 QPV to the municipal use regulations and second-home legislation; the permissible use is conclusively examined in the building permit procedure. Whether the indicative project can be implemented as planned falls within investor risk; no claim based on good faith or compensation exists. In addition, the new Art. 23 QPV permits the repeal or amendment of the quartier plan if no building application is filed within five years or if the building permit is not utilised within one year.

Construction advisory (Art. 8, 9, 5 BauG/Davos): The complaint that the construction advisor Marcel Liesch was biased due to mandates for the municipality was only raised in the reply; the municipality refuted it with a confirmation that only preparatory work for a tender had taken place, which was not disputed. There is no violation of the right to be heard. The substantive complaints concerning construction advisory are not arbitrary: according to Federal Supreme Court judgment 1C_388/2009, the construction advisor is an elected member of the building commission with an advisory vote and not an external expert; the advice was given orally, although two written reports existed. The report of 26 July 2016 was incorporated into the approval decision and enabled an adequate challenge to the utilisation bonus.

Utilisation bonus and design (Art. 121, 121a, 112 BauG/Davos): The complaint of appellants 3 against the utilisation bonus fails insofar as it relies on BGE 1C_313/2015: that consideration concerned consideration for buildings worthy of preservation under Art. 112 BauG/Davos, not the heightened design requirements under Art. 121 BauG/Davos. The Administrative Court found that the indicative project clearly exceeds the general design requirements; the integration was good to very good, and the project is not a foreign element. Reference to future urban development is not arbitrary, since Art. 121a para. 1 BauG permits the renewal of existing quarters and the zoning plan intends dense development in the Inner Centre Area. The privileging was taken into account during the inspection on site.

Access and noise protection (Art. 24 para. 2 EPA): The Derby site is developed for its existing use (traffic, water, wastewater, energy), but not for the denser development, which requires changes to access roads and utility lines. Art. 24 para. 2 EPA is nevertheless not applicable: the provision is intended to enable the planning-desirable rezoning of existing building zones and to promote inward densification (analogously BGE 1A.21/2003 consid. 5.2). The existing access may therefore be adapted without applying the planning values.

Road noise…