Facts
Parties and Instances: The appellants (six neighbours of the construction plot, owners of adjacent properties, represented by two lawyers) appeal to the Federal Supreme Court against the judgment of the Administrative Court of the Canton of Zurich, 1st Division, 1st Chamber, of 11 April 2017 (VB.2016.00676). The respondent is the building client, represented by a lawyer. The Building Commission of the City of Wädenswil is also involved.
Facts: By decision of 22 March 2016, the Building Commission granted the building client a permit for a multi-family house on cadastral parcel no. 13228. With regard to the design, it required in condition no. 2 of the permit an adjustment of the project in the attic: the sloped pitched roof in the area of the projecting flat-roof annex was to be supplemented in order to achieve a good overall effect. Amended plans were to be submitted for approval before construction release.
Procedural History: The neighbours lodged an appeal with the Building Appeals Court. This court annulled the building permit with regard to the balcony on the attic floor and dismissed the appeal for the remainder. The Administrative Court dismissed the neighbours' appeal. It held that the roof extension was not inadmissible from the outset, since there was merely a minor excess of the permissible building height of 7.5 m by 0.1 m and there was architectural leeway (for example, waiving the projection or reducing the terrace covering from 2.5 m to 2 m).
Requests before the Federal Supreme Court: The appellants request that the judgment of the lower court be set aside and the building permit be refused, or alternatively that the matter be remitted to the lower court. The appellants complain that the roof extension was ordered by the Building Commission and was not contested by the building client, so it could not be waived; that it leads to an excess of the building height; and that it gives the building a dominance incompatible with the neighbourhood.
Legal Question: Whether the decision of the lower court is a final decision or an interlocutory decision, and whether the requirements for an appeal against an interlocutory decision (Art. 93 FSCA) are met.
Considerations
Examination of admissibility ex officio: The Federal Supreme Court examines the admissibility requirements ex officio (Art. 29 para. 1 FSCA). In principle, the appeal in public law matters is open against the final cantonal decision in building law. The appellants, as neighbours, have standing (Art. 86 para. 1 FSCA). However, it is questionable whether a final decision within the meaning of Art. 90 FSCA exists.
Pending condition as a procedural obstacle: The approval of the amended plans for the roof extension is a condition for the practical effectiveness of the building permit, since construction may not begin before this approval. According to case law, the building permit procedure is not concluded as long as the building authority still has a margin of discretion in assessing the fulfilment of the condition.
Existence of a margin of discretion and interlocutory decision: The extension of the sloped roof is not further defined and leaves architectural leeway, for example by waiving the projection or reducing it, so the approval includes a margin of discretion. The procedure is therefore not concluded until the Building Commission approves the plans. The…