Facts
The Municipal Council of Spreitenbach placed the development plan 'P 092 Handels- und Gewerbezone Ost' (development plan HGO) on public display from 31 October to 29 November 2011. The planned development by the Migros Aare cooperative comprised residential, commercial, service and retail uses, namely an OBI DIY store with 10'000 m2 of retail space, 425 apartments in two 19-storey high-rise buildings and 700 underground parking spaces. The development adjoins the existing Tivoli shopping centre and is connected to it via footbridges and parking levels; Tivoli is in turn connected to Shoppi, Limmatpark and Umwelt-Arena.
The Swiss Traffic Club (VCS) lodged objections, which the Municipal Council rejected on 27 August 2012. Upon appeal by the VCS, the Department of Construction, Transport and Environment of the Canton of Aargau annulled the decision and refused approval. Upon appeal by Migros Aare and the municipality, the Administrative Court of the Canton of Aargau partially upheld the appeals on 28 November 2014: the environmental impact assessment (EIA) was incomplete because Tivoli had not been included; this only led to remittal to the municipality. Shoppi, Limmatpark and Umwelt-Arena, by contrast, were not to be included.
On 26 January 2015 the VCS filed a public law appeal with the Federal Supreme Court and requested that the decision be set aside insofar as the necessity of including the overall complex of Shoppi-Tivoli/Limmatpark/Umwelt-Arena was denied. The primary issue in dispute was whether the remittal decision was a (partial) final decision under Art. 90 et seq. FSCA or an interlocutory decision under Art. 93 FSCA.
Considerations
The remittal decision binds the lower instance as to the scope of the EIA obligation. The VCS relied on the earlier practice under the FJA, according to which decisions on the EIA obligation were appealable as partial decisions (Art. 91 lit. a FSCA; BGE 115 Ib 342). The Federal Supreme Court holds that substantive-law decisions of principle which assess only one aspect and still leave the lower instance some scope for decision are interlocutory decisions under the FSCA (BGE 133 V 477; BGE 132 III 785; BGE 134 II 124). Procedural economy concerns are taken into account within the framework of Art. 93 FSCA.
The EPA and the EIAO do not provide for a preliminary decision on the existence and scope of the EIA obligation; Art. 8 para. 2 EIAO requires only an opinion. The decisive procedure is the special land-use planning procedure (Art. 5 para. 3 EIAO). A final decision therefore does not exist.
Nevertheless, the Federal Supreme Court affirms standing to appeal against the interlocutory decision on the basis of Art. 93 para. 1 lit. a FSCA: the scope of the EIA must be clarified before the development plan procedure is resumed, in order to avoid a procedural futility. Mere prolongation of proceedings generally does not constitute a non-reparable disadvantage; however, given the complexity of the proceedings and the requirement of a reasonable procedural duration (Art. 29 para. 1 Cst.), admission is warranted here (BGE 136 II 165).
On the merits, the Federal Supreme Court examines the concept of a installation (Art. 7 para. 7 EPA, Art. 8 EPA, Art. 2 para. 4 OAPC) and the requirement of a functional connection. A composite installation generally exists where individual installations interact, at least in part areas, beyond official conditions; common organisation, planning or ownership point towards this (BGE 131 II 103; BGE 124 II 75).
The Administrative Court limited itself to a mere reference to the reasoning of the BVU, although the VCS had submitted new evidence and evidentiary motions. This violates the duty to give reasons and the…