Facts
[B. Sagl] , a limited liability company active in the production, processing and sale of herbs and organic products, is the owner of a parcel in the Municipality of [X.] (locality of [W.] ), partly located in the village zone, partly in the zone for accessory buildings and partly in the remaining municipal territory outside the building zone. The parcel is partially affected by danger zone 2. The partner and manager of the company, [A.] , is the appellant.
On 10 October 2012 the municipal building authority granted the owner a building permit for a new production facility, including a flood protection wall located largely in the non-buildable sector of the parcel. In September 2013 the building authority ordered the immediate suspension of the works, noting the construction of a boundary wall not approved in the remaining municipal territory. The owner then requested, on 10 October 2013, retroactive construction permission for boundary walls and the formation of a new embankment on the boundary between the parcels, following an application of 19 September 2013 seeking to modify the position of the protective wall.
By decision of 26 May 2015 the Municipal Council of [X.] , acting as building authority, rejected the application for retroactive construction permission, but decided to tolerate the works carried out and imposed on the appellant, as responsible client, a fine of CHF 10,000.--.
By judgment of 8 June 2016 the Administrative Court of the Canton of Grisons, 5th Chamber, dismissed the appellant's appeal, confirming the refusal of an exceptional authorisation under Art. 24 SPA, in particular for lack of the requirement of a site bound by its location, as well as the amount of the fine.
The appellant challenges this judgment before the Federal Supreme Court, requesting as a primary measure the reduction of the fine to an amount between CHF 200.-- and CHF 800.--, and as a subsidiary measure the annulment of the judgment with remittal to the cantonal court. He complains of arbitrary application of cantonal and federal law. The cantonal court and the Municipality request dismissal of the appeal. By presidential order of 25 August 2016 suspensive effect was granted.
Considerations
The public law appeal is admissible against the final decision of the last cantonal instance concerning the refusal of a building permit and the related fine (Art. 82 let. a, 86 para. 1 let. d, 90 and 100 para. 1 FSCA, Art. 34 para. 1 SPA). The appellant, addressee of the decision and affected in his interests, has standing under Art. 89 para. 1 FSCA.
As to the requirement of a site bound by its location, the Federal Supreme Court recalls that an authorisation outside the building zone requires the cumulative fulfilment of the conditions of Art. 24 SPA: the intended use must require a location outside the building zone (let. a) and no overriding interests may oppose it (let. b). The requirement of a bound location has an objective character and imposes strict demands, but a relatively bound location is sufficient, in the sense that the chosen site must appear substantially more favourable than alternative locations within the building zone, on the basis of particularly important and objective reasons. It is not necessary that the location be the only possible one.
In the present case, the cantonal court denied the requirement solely because the construction in its actual position was not an indispensable premise for the issuance of the permit of the Building Insurance, the latter not having excluded an alternative solution. This reasoning is insufficient: the cantonal court did not carry out a specific weighing of interests with reference to the places and the project, although the Building Insurance and the Municipality had considered the implementation of the protective works in the remaining municipal territory more appropriate, from a technical and landscape standpoint. The cantonal court has therefore violated Art. 24 let. a SPA.
The Federal Supreme Court further notes that, even in case of refusal of an exceptional authorisation, the cantonal judge could not dispense with examining a restoration measure. Formally unlawful constructions that cannot be legalised must in principle be demolished (BGE 136 II 359 consid. 6; Art. 94 para. 1 LPTC), so as to prevent the separation between building and non-building zones from being called into question. A demolition order may be excluded only in the presence of disproportion, violation of good faith or prescription, and restoration may be waived only if the deviation from the authorisation is insignificant, demolition does not pursue public…