Facts
The appellant [A.] is the usufructuary of a condominium unit on parcel No. 1583 in Lauenen, which directly borders parcel No. 483. On 31 January 2014 the municipality of Lauenen (Municipality) resolved an amendment to the zoning plan and the building regulations, by which the Zone for Public Use C (ZöN C, senior and nursing home) in Pfruendmatte is extended to the northern part of parcel No. 483 (3'033 m2, previously agricultural zone). The purpose is the construction of supervised senior residences.
The Office for Municipalities and Regional Planning of the Canton of Bern (AGR) approved the planning on 24 April 2014 and at the same time dismissed the appellant's objection. The Department of Justice, Municipalities and Churches (JGK) dismissed the complaint on 13 February 2015. The Administrative Court of the Canton of Bern dismissed the administrative law appeal by judgment of 23 June 2016. The local planning of 27 November 2010 had been approved on 26 September 2011.
By appeal in public law matters of 22 August 2016, the appellant requests the annulment of the judgment of the administrative court and of the approval decision, alternatively the remittal to the AGR. She complains in particular of the violation of the stability of planning (Art. 21 para. 2 SPA), of the requirements of the cantonal structure plan and of the Technical Guidelines for Building Zones (TRB), of the development infrastructure, of the water body space (Art. 15 para. 4 lit. a SPA) and of the size of the rezoning. The Federal Office for the Environment held that the contested judgment does not violate environmental protection law. The Federal Council had approved the new Bern cantonal structure plan on 4 May 2015. By presidential order of 14 September 2016, suspensive effect was granted to the appeal.
Considerations
The appeal against the final cantonal decision in a public law matter is admissible (Art. 82 lit. a, 86 para. 1 lit. d, 89 para. 1, 90 FSCA). The appellant, as usufructuary of a directly adjoining property, has standing to appeal.
Applicable law: The administrative court correctly examined the rezoning on the basis of the new Bern cantonal structure plan and the revised version of Art. 15 SPA. The transitional provision of Art. 38a para. 2 SPA (moratorium on rezoning until approval of the structure plan amendment, specified in Art. 52a SPO) was applicable until the approval of the structure plan. Thereafter, it would be diametrically opposed to the public interest to return to the old law, since precisely the prejudging of structure plan amendments and downzoning is to be prevented. A claim to the right to be heard was observed; the complaint that there is a lack of review of discretion does not demonstrate a violation of federal law. The report missing under Art. 47 SPO may be dispensed with, provided that the files sufficiently clearly show that the substantive requirements are met, which is possible here given the limited scope.
Stability of planning (Art. 21 para. 2 SPA): Land-use plans must be adapted when circumstances change significantly. Subsequent minor extensions of the building zone are permissible if they supplement the existing planning only in subordinate points and no comprehensive review is required. The rezoning took place only about 2.5 years after the preceding approval, which in principle speaks against its admissibility, especially since the need could have been assessed earlier. It is nevertheless admissible by way of exception, because the area is small, is tied to the purpose of the existing ZöN and directly adjoins it, borders the building zone on three sides, and the appellant is affected only as a neighbour (view and minor emissions from senior residences). A substantial public need for senior residences outweighs the concerns. The complaint is unfounded.
Structure plan, TRB and Art. 15 SPA: The TRB do not apply to the ZöN, since they cover residential, mixed and centre zones and other zone types are to be assessed according to general criteria of plausibility. Senior residences are conforming to the zone in the ZöN under Art. 77 BauG BE without further ado, since they have a functional connection to the senior home and make sense only in immediate proximity. However, when calculating the 15-year building land requirement for housing (measure sheet A_01), it must be taken into account that persons from existing…