Facts
On 2 March 2011, the company [A. SA] (applicant) and its owner [B.] filed an application for authorisation to build a set of housing units with shops on the ground floor and an underground garage, on plots nos. 4'544 and 2'323 of the municipality of Plan-les-Ouates, located in a protected zone 4B (villages and hamlets).
The project provided for the demolition of three old buildings at 137, 139 and 141 route de Saint-Julien, comprising shops and ten dwellings (33.5 rooms in total, overall floor area of 944 m²). The new buildings were to include shops and apartments on the ground floor, two storeys and attic space, namely ten rental apartments with controlled rents and 13 apartments under PPE (condominium ownership) or at free rents.
The Commission for Monuments, Nature and Sites, Architecture Sub-Commission (CMNS), issued two negative opinions on 21 June 2011 and 18 September 2012. According to a historical and architectural analysis report, buildings nos. 139 and 141 were rated 4+ (good integration of volume and substance) and no. 137 was rated 3 (interesting). The buildings fitted perfectly into the historical street-village environment, with private gardens at the rear. The municipality of Plan-les-Ouates first issued an unfavourable opinion (absence of a double-pitched roof), then a favourable opinion with minor reservations after the project was modified.
By decision of 12 November 2013, the Department of Territory, Housing and Energy (DALE) refused the authorisation, based in particular on the CMNS opinion and on the aesthetic clause of art. 15 para. 1 LCI. The Geneva Administrative Court of First Instance upheld this refusal on 10 April 2014, and the Administrative Chamber of the Court of Justice of Geneva subsequently confirmed it by judgment of 29 September 2015. According to that authority, the clause of art. 106 para. 1 LCI, applicable to protected villages, founded the refusal; the refusal did not constitute a disguised protection measure; the CMNS opinion, issued after a local inspection, was binding and reasonable; the obligation to make use of the existing built structures was not disproportionate, as the renovation estimates had not been drawn up on concrete projects.
The appellants lodged a public law appeal with the Federal Supreme Court, seeking annulment of the cantonal judgment and of the refusal decisions, and an order directing DALE to grant the authorisations. DALE seeks dismissal of the appeal.
The main grievances concern the incomplete establishment of the facts (ten dilapidated dwellings left unrented, 23 apartments planned of which ten are subject to the LDTR), the lack of a sufficient legal basis and arbitrariness in the application of art. 106 LCI, art. 15 LCI which would not allow a demolition to be refused, and the violation of proportionality and of the guarantee of property.
Considerations
The Federal Supreme Court first examines the admissibility of the appeal (arts. 90, 86 para. 1 let. d, 82 let. a, 89 para. 1 FSCA) and admits it, the appellants being particularly affected by the refusal of authorisation. As regards the grievance of incomplete establishment of the facts, it recalls that the Federal Supreme Court relies on the facts established by the previous authority (art. 105 para. 1 FSCA), save in cases of arbitrariness (art. 9 Cst.) or violation of law within the meaning of art. 95 FSCA, and that the defect must be capable of affecting the outcome of the case (art. 97 para. 1 FSCA). In this case, the cantonal court expressly mentioned the project (23 dwellings for 101 rooms, commercial areas and floor areas); the grievance is therefore rejected.
With regard to the legal basis of art. 106 LCI, the Federal Supreme Court applies the restricted review for arbitrariness to the interpretation of cantonal norms. It notes that this provision, which is specific to protected villages, grants the department broad discretion to determine the siting, height, volume and style of constructions, and allows a project to be refused where it would excessively harm the character of a protected village, either because the existing buildings deserve particular protection or because the project is unsatisfactory from the standpoint of integration. The department relied on the CMNS opinion, which is required by the same provision and which notes the historical coherence that the existing buildings bring to the street-village. The cantonal judgment is therefore not arbitrary.
As for art. 15 LCI, the Federal Supreme Court holds that the prohibition on demolition is closely linked to the prohibition on construction, justified both by the need to protect the village and by the unsatisfactory character of the project. It is reasonable to exclude the destruction of the buildings so long as a satisfactory replacement solution has not been presented, as confirmed by art. 15 para. 3 LCI. The refusal is not, however, absolute: the CMNS does not rule out renovation or reconstruction respectful of the facades, roofs and heights. The cantonal legal bases are therefore sufficient and are not arbitrary.
From the standpoint of…