Facts
In the context of a national road project (connection N20 at Birmensdorf, feeder NK 410), the Canton of Aargau planned a tunnel in the municipality of Oberwil-Lieli that passes under parcel No. 440 owned by [A.] . The owner, a lawyer and notary, filed an objection during the public inspection procedure. The Federal Department of the Environment, Transport and Communications (UVEK) granted plan approval on 2 February 2004 and ordered that, instead of full expropriation, limited rights in rem (easement) be established.
On 8 August 2006 the Canton and the owner concluded an easement agreement concerning an underground building right. The compensation comprised CHF 2.- per m2 for the easement (CHF 3'306.-), CHF 108.- per m2 for inconveniences (CHF 178'524.-) and a party compensation of CHF 8'000.-. Item III.2 of the agreement additionally provided, purely as an obligation, CHF 440.- per anchor, CHF 0.48 per m2 and year for temporary land use, and amounts for lost fruit trees. The term 'anchor' was not specified, and no distinction was made between prestressed anchors and non-prestressed anchors (nails).
By decision of 5 November 2007, the President of the Federal Expropriation Commission, District 8 (ESchK), wrote off the conciliation procedure. On 19 September 2007 the Canton calculated anchor compensation of CHF 34'020.- (13 anchors at CHF 440.- and 566 nails at CHF 50.-). In addition, 114 anchors and 328 nails that were not entitled to compensation had been installed on the construction site.
On 8 April 2011 the owner filed a 'claim' with the ESchK, demanding CHF 420'341.25 plus default interest for all prestressed anchors and nails at CHF 440.- each. By decision of 26 June 2014, the ESchK awarded CHF 55'880.- for 127 anchors and CHF 44'700.- for 894 nails (CHF 50.- per nail), plus 3.5% interest from 1 July 2007.
The Federal Administrative Court (judgment of 21 October 2015, corrected on 3 November 2015) partially upheld the owner's appeal and the Canton's cross-appeal. It assumed a normative consensus and set the compensation for prestressed anchors and nails at CHF 449'240.- plus 3.5% default interest. The Canton filed a public law appeal (proceeding 1C_613/2015) requesting that the claim be dismissed. The owner filed an appeal (proceeding 1C_637/2015) and requested 5% instead of 3.5% default interest. The ESchK raised the question of the hourly rate for party compensation.
Considerations
The appeals are directed against the same decision and are joined. The easement agreement is to be qualified as an administrative expropriation contract under federal law, as it concerns a federal public work (national road). The public law appeal is admissible under Art. 82 lit. a, Art. 86 para. 1 lit. a and Art. 91 lit. a FSCA; the Federal Supreme Court examines the interpretation of the agreement under federal law with full power of review. Both parties have standing to appeal, and the owner filed the appeal in time.
Under the principle of good faith, a contract is to be interpreted as it could and had to be understood according to its wording, context and circumstances. There was no actual consensus regarding the term 'anchor'; the Federal Supreme Court examined whether a normative consensus existed. It holds that the owner, as a lawyer and notary, should have recognised in good faith that the anchor compensation of CHF 440.- per anchor, which was visible on the construction site in the form of hundreds of anchor heads, would amount to a multiple of the main compensation. This should have prompted an inquiry to the Canton; the anchor compensation had never been negotiated and was not contained in main item III.1.
A normative consensus in the owner's sense, under which all anchors and nails were to be compensated at CHF 440.-, therefore does not exist. Equally, there is no normative consensus in the Canton's sense, under which only prestressed anchors up to a depth of 7 m were to be compensated, since there are no indications for a differentiation by depth, and in its settlement of 19 September 2007 the Canton itself acknowledged an obligation to compensate nails.
A hidden dissent therefore exists with respect to the nails: neither an actual nor a normative consensus existed as to how nails were to be compensated. A hidden dissent leads to the complete nullity of the contract if it concerns an objective essential term or an accessory term that was subjectively essential for one party and recognisable to the other (Art. 2 CO by analogy). Compensation for nails was decisive for the owner in signing the agreement, and important for the Canton in order to avoid an unexpectedly high total compensation. The dissent is therefore not minor, and the agreement as a whole did not come into being.
The ESchK wrongly supplemented the agreement by…